Skip to content
Çilek Havuz
MSB Riva · Training Pool, Riva, Istanbul, photo 1 of 6

Public Sector

MSB Riva, Training Pool.

Riva, Istanbul

Go to the story

Project Specifications

Location
Riva, Istanbul
Type
Training Pool
Depth
10 m
Completion
Completed

// 01 · The story of the project

Professional 10-metre-deep training pool built by Çilek Havuz for the Ministry of National Defence facilities in Riva, Istanbul; turnkey completion with military-grade filtration, lighting and mechanical systems.

MSB Riva · Training Pool, Riva, Istanbul, photo 2 of 6
Frame 02Riva, Istanbul
MSB Riva · Training Pool · project video

Site video

MSB Riva · Training Pool, Riva, Istanbul, photo 3 of 6
Frame 03Riva, Istanbul
MSB Riva · Training Pool, Riva, Istanbul, photo 4 of 6
Frame 04Riva, Istanbul
MSB Riva · Training Pool, Riva, Istanbul, photo 5 of 6
Frame 05Riva, Istanbul
MSB Riva · Training Pool, Riva, Istanbul, photo 6 of 6
Frame 06Riva, Istanbul

// 02 · Scope

The work we carried out on this project, service by service.

Each piece of work in the project scope is explained on its own service page with dimensions, process and materials.

Projects of this type: Hotel and commercial pool construction

// 03 · Products

The systems in this project, by product group.

Product groups for the type of work in this project; models, technical sheets and list prices are on the category pages.

// 04 · Configurator

Set up a similar space, yourself on screen.

The design studio opens with this project's type; choose materials and colours and request a quote with your selection.

Long villa pool with a travertine edge and olive trees at sunsetPool

Design studio

Build your pool, sauna, steam room or Turkish hammam on screen with lining, timber and marble options, then request a quote with your selection.

Where would you like to start?

// 05 · Guides

For a project of this kind, articles worth reading.

Our articles on dimensions, materials and costs for this type of project.

All articles

// 06 · Similar projects

Of the same kind, other projects we have completed.

All projects

// 07 · Transformation

The change on site, from construction to handover.

Photos of four installations taken from the same angle. Drag the line to compare the construction stage with the finished handover.

Villa Pool, After
Villa Pool, Before
BeforeAfterDrag to compare

Project Specifications

Villa Pool

A villa garden still at rough-construction stage was transformed into a living space woven into the architecture, with a hidden overflow system and a water surface resolved flush with the deck.

Structure
Concrete
System
Hidden Overflow
Delivery
Turnkey
01 / 04

Next step

Let us discuss your project in the way that suits you best.

You can fill in the form for a written quote, schedule a video project presentation or ask us to survey your project site.

  • Get a Quote

    Send us your dimensions and expectations in writing.

  • Online presentation

    Video project presentation

  • On-site survey

    Inspection at your project site

// 08 · Company & Contact

To talk about your project, call or write to us.

Legal Name

Çilek Havuz

Founded

1998 · Istanbul

Head Office

Çilek Plaza, Eyüp Sultan Mah. Yakacık Cd. Feshane Cd. No: 2 D:4 D:1, 34885 Sancaktepe / İstanbul

Service Area

All of Türkiye · exports to 14 countries

Branches

Kyrgyzstan · Egypt · Algeria · Iraq

Showroom

Plan a showroom visit

At our showroom in Çilek Plaza, Sancaktepe, you can discuss your project with our team. We recommend booking an appointment by phone before your visit.

Working Hours

  • Monday – Friday · 08:00 – 17:30
  • Saturday · 08:00 – 12:30
  • Closed on Sunday
Directions

Frequently Asked Questions

About our projects: the questions we hear most.

Çilek Havuz Corporate

Pool and Wellness Engineering

Response Time
Same day
Channels
Phone · Email · WhatsApp

If the answer you are looking for is not here, send your question directly to us and our team will reply as soon as possible.

+90 216 475 39 37

Training pools are much deeper (10 m+) with heavier reinforced concrete. Military training pools include diving platforms, underwater lighting, high-flow filtration and temperature control as standard.

Çilek Havuz Corporate

The duration depends on ground conditions, concrete thickness, mechanical scope and waterproofing tests. After the survey and design we share a work schedule specific to the project.

Çilek Havuz Corporate

Public facilities must meet TSE standards, Ministry of Health regulations and the relevant agency's own technical specifications. Water quality, safety equipment and accessibility requirements are more extensive than in private-sector projects.

Çilek Havuz Corporate