Skip to content
Çilek Havuz
MSB Riva · Training Pool

MSB Riva · Training Pool

Professional 10-metre-deep training pool built for the Ministry of National Defence facilities in Riva, Istanbul; turnkey completion with military-grade filtration, lighting and mechanical systems.

Approach

Ending the water where the view ends.

We aligned the overflow channel to the ground level to the millimetre; the pool edge disappears and the water surface flows straight to the horizon. The shifting light wanders quietly across the still surface all day.

MSB Riva · Training Pool
MSB Riva · Training Pool — Referans 1
MSB Riva · Training Pool — Referans 2
MSB Riva · Training Pool — Referans 3
MSB Riva · Training Pool — Referans 4

Our projects

Every project is a transformation story; see the before and after for yourself.

Villa Pool — After
Villa Pool — Before
ÖnceSonra
BeforeDrag to see the transformationAfter

ÇİLEK HAVUZ · DIGITAL STUDIO

Your dream space.
Your personal touch.

Explore materials and try different combinations. Take the first step towards imagining your space.

Pool · DESIGN INSPIRATION
DESIGN INSPIRATION
01 / 04

Start with the colour of water.

Explore finishes and surroundings for your pool.

WHERE SHALL WE START?

Choose your space.

Start designing

No account needed to explore.

  1. 01

    Choose your space

    From pools to hammams, find your starting point.

  2. 02

    Try the details

    Express your style with materials and colours.

  3. 03

    Share your design

    Share your choices with a link.

Selected Projects

Portfolio ·

Projects

Company & Contact

To talk about your project, we are one call away.

Legal Name

Çilek Havuz

Founded

1998 · Istanbul

Head Office

Çilek Plaza, Eyüp Sultan Mah. Yakacık Cd. Feshane Cd. No: 2 D:4 D:1, 34885 Sancaktepe / İstanbul

Service Area

All of Türkiye · exports to 14 countries

Frequently Asked Questions

Our readers' most asked; with expert answers.

ÇH

Çilek Havuz Content & Technical Team

Guides & Technical Content

Response Time
Same day
Channels
Phone · E-mail · WhatsApp

If the answer you are looking for is not here, send your question directly to us and our team will reply as soon as possible.

Book a free site survey

Training pools are much deeper (10 m+) with heavier reinforced concrete. Military training pools include diving platforms, underwater lighting, high-flow filtration and temperature control as standard.

Çilek Havuz Content & Technical Team

Deep training pools take an average of 16-24 weeks from soil survey to commissioning, depending on ground conditions, concrete thickness, mechanical scope and waterproofing tests.

Çilek Havuz Content & Technical Team

Public facilities must meet TSE standards, Ministry of Health regulations and the relevant agency's own technical specifications. Water quality, safety equipment and accessibility requirements are more extensive than in private-sector projects.

Çilek Havuz Content & Technical Team