Skip to content
Çilek Havuz
Çilek Havuz — Since 1993

Pool Construction

Turnkey pool building for residential and commercial projects.

Scroll

Çilek Havuz in Numbers

Since 1993 we have been turning water into art, through engineering discipline.

33+
Years
14
Export
350+
Projects

Pool Construction — Frames from Our Projects

Frames from Our Projects

06 media

Quick Contact

Let Us Call You

Leave four details and your account manager will call you about projects anywhere in Türkiye — or reach us directly on the lines below.

Call Directly+90 216 475 39 37WhatsAppMessage Us
Duygu TuncarSales & Client Relations

Process

Our Pool Construction Process

Preliminary Survey & Feasibility
1–2 daysFree Online Pre-Consultation

The Çilek Havuz technical team begins your project by listening to you in an online meeting. The current state of the site, intended use, your expectations and the applicable technical conditions are evaluated together.

At this stage we clarify the pool's location, approximate dimensions, indoor or outdoor preference, plant-room position, drainage needs and budget frame. Critical topics such as ground bearing capacity, groundwater level, zoning status and distances to neighbouring structures are covered within the preliminary feasibility study.

The goal is to determine the right system, the right cost range and a workable roadmap before the project begins.

  • Site dimensions and intended use
  • Indoor / outdoor pool preference
  • Ground bearing capacity
  • Drainage and groundwater conditions
  • Plant-room location
  • Zoning and permit requirements
  • Pool type and usage capacity
  • Preliminary budget and build scenario

Why it matters

In pool projects that start without a proper feasibility study, mistakes in ground conditions, drainage, plant-room or capacity can lead to serious costs later on. At Çilek Havuz we review the technical picture with you at the very first stage and set the project on solid ground.

Pool Design & Engineering
2–4 daysTechnical Planning and Project Kick-off

At Çilek Havuz every project begins with sound analysis and engineering planning. Site dimensions, intended use, architectural expectations, ground conditions and technical infrastructure needs are evaluated together.

At this stage the pool's form, system, depth, plant-room position, filtration needs and construction method are clarified. The goal is a pool project that is buildable on site, long-lasting and predictable in budget.

  • Site dimensions and project goal
  • Pool type and intended use
  • Ground and site conditions
  • Plant-room layout
  • Filtration system requirements
  • Architectural and technical fit
  • Preliminary budget assessment
  • Construction roadmap

Why it matters

In pools that start without proper engineering, errors in dimensions, system, capacity or infrastructure can lead to serious costs later on.

Pool Models & System Selection
1–2 daysChoosing the Right Pool Model

Every pool model offers different advantages depending on intended use and site conditions. For a villa, hotel, residential complex or commercial use, choosing the right model is a critical decision for both aesthetics and operating performance.

At this stage skimmer, overflow, infinity, prefabricated or custom-design pool options are evaluated. The Çilek Havuz technical team pins down the most suitable model for your project in technical and budget terms.

  • Villa pool options
  • Hotel and commercial pools
  • Skimmer system analysis
  • Overflow system analysis
  • Infinity pool selection
  • Prefabricated pool alternative
  • Usage capacity calculation
  • Model selection to fit the budget

The right model makes the difference

The pool model determines not just the look, but maintenance cost, energy consumption, comfort of use and long-term operating performance.

Skimmer & Overflow Pool Systems
1–2 daysSystem Comparison and Technical Choice

Skimmer and overflow pool systems work on different principles for water circulation and surface cleaning. The right system should be chosen according to the pool's intended use, budget, architectural expectations and technical infrastructure.

Skimmer systems offer more economical and compact solutions, while overflow systems provide a more premium look and stronger surface circulation. Çilek Havuz evaluates both systems technically against the needs of the project.

  • Advantages of skimmer systems
  • Advantages of overflow systems
  • Balance tank requirements
  • Surface circulation analysis
  • Plant-room requirements
  • Cost comparison
  • Ease-of-maintenance assessment
  • System selection for the project

System choice is critical

A wrongly chosen pool system can cause long-term problems in cost, maintenance, water balance and comfort of use.

Pool Structural Construction
Varies by projectExcavation, Rebar and Reinforced Concrete

A long-lasting pool starts with the structural work done right. Excavation, ground preparation, steel reinforcement, formwork and the reinforced-concrete stage must be planned to engineering detail.

At this stage the load-bearing capacity of the pool shell, water pressure, ground conditions and waterproofing details are evaluated together. Çilek Havuz manages the structural phase in line with the technical design and site conditions.

  • Excavation and level preparation
  • Ground improvement needs
  • Steel reinforcement work
  • Formwork and concrete casting
  • Wall-to-floor joints
  • Waterproofing preparation
  • Pipe penetration details
  • Concrete quality control

The foundation must be solid

A mistake in the pool's structural work can lead to cracking, water leaks, settlement and finishing problems.

Pool Electromechanical Installation
Varies by projectFiltration, Circulation and Technical Systems

A healthy pool depends on properly planned electromechanical installations. Pumps, filters, piping, lighting, control panels, dosing and automation systems directly determine the pool's performance.

At this stage the pool volume, usage intensity, circulation time and equipment capacities are calculated technically. The goal is a pool system that runs clean, balanced, safe and efficient.

  • Pump capacity selection
  • Filter system sizing
  • Piping routes
  • Electrical panel layout
  • Lighting infrastructure
  • Chemical dosing system
  • Automation options
  • Energy-efficiency check

Performance is decided here

A wrongly sized pump, filter or pipe diameter directly affects water quality, energy consumption and maintenance costs.

Pool Finishing & Cladding
Varies by projectWaterproofing, Cladding and Aesthetic Completion

Once the structural work is complete, the pool's waterproofing, cladding and surrounding details are applied. This stage determines both the pool's aesthetics and its long-term quality of use.

Ceramic, mosaic, porcelain, natural stone, decking and grouting details are selected to match the project concept. Çilek Havuz runs this stage to technical standards, from material selection to application detail.

  • Waterproofing application
  • Cladding material selection
  • Ceramic and mosaic details
  • Grouting quality control
  • Coping stone planning
  • Deck and surround cladding
  • Step cladding details
  • Aesthetic finish check

Detail reveals quality

Cladding and waterproofing mistakes can cause water leaks, grout failure, surface deformation and aesthetic loss.

Pool Testing & Commissioning
1–3 daysSystem Checks and Handover Preparation

Once the pool is complete, all mechanical, electrical and water systems are tested. Filtration, circulation, lighting, leak checks, chemical balance and equipment performance are assessed one by one.

Commissioning ensures the pool enters service safely and healthily. The Çilek Havuz technical team checks the system and provides the briefing you need for daily use.

  • Water filling check
  • Leak testing
  • Pump operation check
  • Filter system test
  • Lighting check
  • Chemical balance adjustment
  • Automation check
  • User briefing

Checks are essential before handover

Pools used without commissioning can develop problems in water quality, equipment performance and safety.

Pool Maintenance & Long Service Life
PeriodicMaintenance, Checks and Performance Tracking

Regular maintenance is essential for a pool to run trouble-free for many years. Water balance, filter cleaning, pump checks, chemical measurements and surface care must be carried out at set intervals.

During maintenance Çilek Havuz checks not just cleanliness but also system performance, equipment health and water quality — so the pool keeps running both safely and economically.

  • Water chemistry check
  • Filter cleaning
  • Pump performance check
  • Surface and floor cleaning
  • Grout and cladding check
  • Lighting check
  • Equipment maintenance tracking
  • Seasonal maintenance plan

Maintenance protects your investment

In pools without regular maintenance, water quality degrades, equipment life shortens and repair costs rise.

Pool Dimensions & Usage Capacity
1 daySizing, Depth and Capacity Planning

Pool dimensions should be set not only by the size of the site but by intended use and bather capacity. Sizing and depth criteria differ for villa pools, residential complexes, hotel pools and commercial pools.

At this stage the pool's length, width, depth, step area, shallow zone, seating area and user density are evaluated together. The goal is a pool planned for comfort, safety and the right capacity.

  • Pool length and width
  • Depth planning
  • Bather capacity
  • Shallow area needs
  • Step placement
  • Seating area plan
  • Assessment for children's use
  • Filtration capacity calculation

Sizing must be right

Incorrect sizing directly affects comfort of use, filtration performance and operating costs.

Pool Cost & Budget Planning
1–2 daysPreliminary Costing and Budget Control

Pool cost varies with many items: dimensions, system type, reinforced-concrete structure, cladding, mechanical installations, lighting and landscaping. That is why sound budget planning is one of the most important stages of the project.

Çilek Havuz clarifies the requirements before the project starts and builds a workable cost frame — so design, technical system and budget move on the same line.

  • Cost by pool dimensions
  • Skimmer / overflow price difference
  • Reinforced-concrete structure cost
  • Cladding and material selection
  • Mechanical installation budget
  • Lighting and automation
  • Landscaping items
  • Preliminary budget planning

The budget must be clear from the start

In projects that begin without proper cost analysis, extra work discovered later can seriously inflate the total investment budget.

Havuz maliyeti kalem kalem: detaylı yazımızı okuyun

The Health Benefits of Swimming
Lasting benefitHealthy Living and Comfortable Use

Swimming is one of the healthiest activities, working the body in a balanced way. It contributes to muscle development, breathing capacity, joint health and posture for adults and children alike.

Regular swimming increases physical activity while supporting mental relaxation and stress control. A well-designed pool is therefore not just an architectural asset but a special space that raises quality of life.

  • Supports muscle development
  • Increases breathing capacity
  • Puts low load on joints
  • Contributes to healthy posture
  • Supports heart rhythm
  • Reduces stress levels
  • Aids children's development
  • Raises quality of life

A pool is a living space

A well-designed pool creates long-term value for sport, rest, family time and healthy living.

Yüzmenin faydalarını detaylı yazımızda okuyun
From The Field

Our story is told through real footage from the field.

Türkiye'nin En Derin Eğitim Havuzu · Mekanik Sistem

Türkiye'nin En Derin Eğitim Havuzu · Mekanik Sistem

Kasım 2025 · 0:44

Türkiye'nin En Derin Eğitim Havuzu · 10 Metre

Türkiye'nin En Derin Eğitim Havuzu · 10 Metre

Ağustos 2025 · 2:28

Sapanca Çetin Bey

Sapanca Çetin Bey

Sapanca · Nisan 2022 · 0:52

Şile Cihan Bey

Şile Cihan Bey

İstanbul · Temmuz 2021 · 0:38

Our projects

Every project is a transformation story; see the before and after for yourself.

Villa Pool — After
Villa Pool — Before
ÖnceSonra
BeforeDrag to see the transformationAfter

Pool Type Comparison

Every project tells its own story; together we choose the right pool.

Installation
6–8 Weeks
Lifespan
20+ Years
Warranty
2 Years
Durability
Customization
Features8/8
  • Custom Shape
  • Variable Depth
  • Infinity Edge
  • Indoor
  • Heating System
  • Automation
  • Waterfall
  • LED Lighting
Installation
2–3 Weeks
Lifespan
5–10 Years
Warranty
2 Years
Durability
Customization
Features6/8
  • Custom Shape
  • Variable Depth
  • Infinity Edge
  • Indoor
  • Heating System
  • Automation
  • Waterfall
  • LED Lighting
Installation
1 Week
Lifespan
5–10 Years
Warranty
2 Years
Durability
Customization
Features6/8
  • Custom Shape
  • Variable Depth
  • Infinity Edge
  • Indoor
  • Heating System
  • Automation
  • Waterfall
  • LED Lighting

Company & Contact

To talk about your project, we are one call away.

Legal Name

Çilek Havuz

Founded

1998 · Istanbul

Head Office

Çilek Plaza, Eyüp Sultan Mah. Yakacık Cd. Feshane Cd. No: 2 D:4 D:1, 34885 Sancaktepe / İstanbul

Service Area

All of Türkiye · exports to 14 countries

Pool Configurator

Design your pool, see it in 3D, get a quote tailored to your configuration.

Overflow · Comfort
Preparing 3D scene…
Çilek Havuz
Width
5m
Length
10m
Comfort PackageMost popular choice
  • Everything in Essential, plus:
  • Heat pump
  • Automatic chemical dosing
  • RGB scene lighting
  • Fiberglass filter upgrade
Water Area50.0
Water Volume80.0
Perimeter30.0m
Wall Area48.0
Overflow Grating30.0m
Balance Tank8.0

The 5 m × 10 m size and the Comfort package are carried into your request form automatically.

Selected Projects

Portfolio · Pool Construction

A selection of pool and spa projects we have brought to life all across Türkiye.

Mehmet Sevigen · Çatalca Infinity PoolVilla

Mehmet Sevigen · Çatalca Infinity Pool

A 12×6 m reinforced-concrete infinity pool completed in Çatalca, Istanbul, in 2025.

Location
Çatalca / İstanbul
Completion
2025
View Project
Hakan Gönen · Hadımköy Hidden-Overflow PoolVilla

Hakan Gönen · Hadımköy Hidden-Overflow Pool

An 11×6 m hidden-overflow concrete pool completed in Hadımköy, Istanbul, in 2024.

Location
Hadımköy / İstanbul
Completion
2024
View Project
Zeynep Mayadağlı · Silivri Hidden-Overflow PoolVilla

Zeynep Mayadağlı · Silivri Hidden-Overflow Pool

A 5×10 m hidden-overflow concrete swimming pool completed in Silivri, Istanbul, in 2024.

Location
Silivri / İstanbul
Completion
2024
View Project
Çetin Uğurlu · Villa PoolVilla

Çetin Uğurlu · Villa Pool

A private villa pool project completed in Istanbul.

Location
İstanbul
Completion
2024
View Project
Rıza Latif · Çekmeköy Overflow PoolVilla

Rıza Latif · Çekmeköy Overflow Pool

An overflow concrete swimming pool completed in Çekmeköy, Istanbul, in 2024.

Location
Çekmeköy / İstanbul
Completion
2024
View Project
Cihan Kızılkaya · Şile Pool ProjectVilla

Cihan Kızılkaya · Şile Pool Project

A private villa pool project completed in Şile, Istanbul.

Location
Şile / İstanbul
Completion
2024
View Project
Dilan Polat · Villa PoolVilla

Dilan Polat · Villa Pool

A private villa pool project completed in Istanbul.

Location
İstanbul
Completion
2024
View Project
Efor Holding · Pool ProjectResidence

Efor Holding · Pool Project

A corporate pool project completed for Efor Holding.

Location
İstanbul
Completion
2024
View Project
Sinan Türker · Yalova Turkish Hammam & SaunaSpa & Wellness

Sinan Türker · Yalova Turkish Hammam & Sauna

A Turkish hammam and sauna wellness project completed in Yalova in 2025.

Location
Yalova
Completion
2025
View Project
Kudu İnşaat · Yalova HammamSpa & Wellness

Kudu İnşaat · Yalova Hammam

A traditional Turkish hammam completed in Yalova in 2025.

Location
Yalova
Completion
2025
View Project
Ayder Tenzile Erdoğan Thermal HotelThermal

Ayder Tenzile Erdoğan Thermal Hotel

In partnership with TOKİ we delivered 42 wet areas turnkey — a complete spa & wellness composition reaching from pools and thermal pools to sauna, steam room, salt room, jacuzzi and shock shower, and from VIP and suite Turkish hammams to Türkiye's largest göbektaşı hammam.

Location
Ayder Plateau / Rize
Completion
2025
View Project
Türkiye's Deepest Training Pool · 10 MetresPublic Sector

Türkiye's Deepest Training Pool · 10 Metres

In Riva we built Türkiye's deepest swimming pool turnkey — 33×22 metres and 10 metres deep. We are proud to have delivered a training facility of this scale to full engineering and safety standards. The pool's water is disinfected by a 600-gram ozone system — making this Türkiye's largest swimming pool using ozone disinfection.

Location
Riva / Istanbul
Completion
2024
View Project
Sofitel Algiers Hamma GardenSpa & Wellness

Sofitel Algiers Hamma Garden

For China State Construction Engineering Corporation (CSCEC) we completed the Sofitel hotel's entire spa turnkey — from pools and hydrotherapy pools to jacuzzi, Vichy shower, Turkish hammam, sauna and massage systems.

Location
Algeria
Completion
2020
View Project

2026 Maliyet Rehberi

Havuz yapım maliyetini etkileyen faktörler

Havuz yapım maliyeti; havuzun boyutu ve derinliği, seçilen sistem (skimmerli veya taşmalı), yapı tipi (betonarme, prefabrik, polyester), kaplama malzemesi (seramik, cam mozaik, doğal taş), mekanik donanım ve çevre düzenlemesi kalemlerinin toplamından oluşur. 2026 yılında Türkiye genelinde bu değişkenler fiyatı birkaç kat farklılaştırabilir. Çilek Havuz Teknik Ekibi, keşif sonrasında proje özelinde şeffaf maliyet döküm tablosu sunar; sonradan sürpriz kalem çıkmaz.

Havuz TipiKurulum SüresiÖmürÖzelleştirmeTeklif
Betonarme Havuz6–8 hafta20+ yılSınırsız (infinity, özel şekil)İncele
Prefabrik Havuz2–3 hafta5–10 yılStandart boyutlarİncele
Polyester Havuz1 hafta5–10 yılFabrikasyon kalıplarİncele
Infinity Havuz8–12 hafta20+ yılTam özel tasarımİncele

* Kesin maliyet, ücretsiz keşif ve proje analizi sonrasında netleşir. Fiyatlar zemin koşulları, bölge ve ekipman tercihine göre değişir. Yapı ruhsatı ve izin süreçleri hakkında Çevre ve Şehircilik Bakanlığı kılavuzu

Bilmeniz Gerekenler

Havuz yapımında sık yapılan hatalar ve nasıl önlenir?

01

Zemin etüdü atlanması

Zemin analizi yapılmadan başlanan projelerde bodrum su baskını, yapısal çatlak ve tabanı itme sorunları sıkça görülür. Her proje zemin etüdüyle başlamalıdır.

02

Düşük kaliteli su yalıtımı

İlk yatırımı kısmak amacıyla ucuz yalıtım malzemesi kullanımı, 2–3 yıl içinde havuzun tamamen boşaltılmasını gerektiren onarımlara yol açar.

03

Yetersiz filtrasyon kapasitesi

Havuz hacmine göre düşük debili pompa ve filtre seçimi, kronik yeşil su sorununa ve sürekli artan kimyasal maliyetine neden olur.

04

Ruhsat ve izin sürecinin atlanması

Belediyeden gerekli yapı ruhsatı alınmadan inşa edilen havuzlar ilerleyen dönemde yıkım yaptırımı veya tapuya şerh riskiyle karşılaşabilir.

05

Yazlık kullanım hesabıyla boyutlandırma

Sadece yaz için tasarlanan havuzlar, sonradan ısıtma ilave edildiğinde yetersiz mekanik altyapı nedeniyle sistemi kaldıramayabilir.

06

Sözlü taahhüde güvenmek

Kapsam, malzeme sınıfı, garanti süresi ve teslim tarihi yazılı sözleşmede net biçimde belirtilmeli; sözlü anlaşmalar uyuşmazlık durumunda geçersizdir.

Şehir ve Bölge Bazında

Türkiye'nin farklı bölgelerinde havuz yapımı

İstanbul'un killi ve yoğun yerleşim zemini, Antalya'nın kalkerli kaya tabanı, Ege kıyılarının granit formasyonu ve İç Anadolu'nun donma derinliği — her bölge farklı mühendislik çözümleri gerektirir. Çilek Havuz, 33 yıllık saha deneyimiyle projeye özel zemin değerlendirmesi yaparak her bölgede doğru sistemi tasarlar.

Frequently Asked Questions

Every question on your mind; answered clearly.

ÇH

Çilek Havuz Technical Team

Pool & Wellness Engineering

Response Time
Same day
Channels
Phone · E-mail · WhatsApp

If the answer you are looking for is not here, send your question directly to us and our team will reply as soon as possible.

Book a free site survey

A turnkey pool is generally completed in 6–12 weeks, depending on its size and the chosen system. After the survey and design stage, the Çilek Havuz Technical Team runs excavation, reinforced concrete, waterproofing, finishing and mechanical installation on a single schedule and keeps to the handover date it promises.

Çilek Havuz Technical Team

Pool cost varies with size and depth, system type (skimmer or overflow), the reinforced-concrete structure, the finishing material (ceramic, mosaic, natural stone), mechanical equipment and landscaping. Before the project starts, the Çilek Havuz Technical Team clarifies every line item and gives you a workable cost framework — so no cost appears as a surprise later.

Çilek Havuz Technical Team

A skimmer system is the more economical and compact solution; an overflow (deck-level) system gives a premium look and stronger surface circulation, but is only built in reinforced concrete with a balance tank. The Çilek Havuz Technical Team recommends the right system for your intended use, your budget and your architectural expectations.

Çilek Havuz Technical Team

Built with sound engineering and waterproofing, a reinforced-concrete pool is used safely for decades. Çilek Havuz gives a written warranty for structural workmanship and the equipment it installs, and provides maintenance and technical support after handover to keep the pool long-lived.

Çilek Havuz Technical Team

Yes. We are the only company to have built Türkiye's deepest training (diving) pool — 10 metres deep with a 3,600 m³ water volume, for a public institution's training centre. We manage pressure, waterproofing and safety engineering at that scale end to end; we build pools to any special depth you need in villas and large projects alike.

Çilek Havuz Technical Team

Planning and permit requirements vary with the pool's location, its size and the status of the plot. During the preliminary survey the Çilek Havuz Technical Team assesses the planning situation with you and guides you through any required consent process.

Çilek Havuz Technical Team

For villa gardens, areas from around 20 m² upwards are generally suitable; the final size is planned around your intended use and the number of people. During the survey the Çilek Havuz Technical Team measures the slope, the ground's load capacity and the plant-room requirement to work out the most efficient layout.

Çilek Havuz Technical Team

In a properly built pool, maintenance is simple: water balance, filter cleaning and equipment checks are carried out periodically. Çilek Havuz reduces the maintenance load to a minimum with automation and dosing systems, and offers a periodic maintenance service on request.

Çilek Havuz Technical Team

Since 1993, Çilek Havuz has delivered turnkey pools for villa, hotel, residential-complex and commercial projects across Türkiye, and also exports to 14 countries with international project experience. A free site survey can be scheduled for your province.

Çilek Havuz Technical Team

2026 yılında betonarme bir villa havuzunun maliyeti; boyutu, sistem tipi (skimmerli veya taşmalı), kaplama malzemesi (seramik, mozaik, doğal taş) ve mekanik donanım tercihine göre önemli ölçüde farklılaşır. Küçük bir villa bahçe havuzu ile büyük bir otel havuzu arasındaki maliyet farkı on katı aşabilir. Bunu tek bir rakama indirgemek doğru değil: zemin yapısı, ulaşım koşulları ve çevre düzenlemesi aynı ölçüdeki iki projeyi bambaşka bütçelere taşıyabilir. Çilek Havuz Teknik Ekibi, ücretsiz keşif sonrasında proje özelinde şeffaf bir maliyet döküm tablosu sunar; böylece teklif aşamasında sürpriz kalem çıkmaz.

Çilek Havuz Technical Team

Infinity (sonsuzluk) havuz, bir veya birden fazla kenardan suyun sessizce taşarak zemine değil, gizli bir toplama teknesine akmasını sağlayan özel bir tasarımdır; bu sayede havuz ile manzara arasındaki sınır görsel olarak ortadan kalkar. Standart taşmalı sistemden temel farkı mimari etkidir: infinity havuzda taşma kanalı görünmez, su sanki sonsuzluğa doğru uzanır. Çilek Havuz Teknik Ekibi, eğimli arazilerde ve deniz veya doğa manzaralı bahçelerde infinity havuz tasarımını projeye başlamadan 3D görselleştirmeyle birlikte sunar.

Çilek Havuz Technical Team

Isıtma sistemi teknik olarak zorunlu değildir; ancak Türkiye'nin büyük bölümünde Ekim–Nisan döneminde su sıcaklığı 15°C'nin altına düşeceğinden ısıtmasız havuzu konforlu biçimde kullanmak güçleşir. Isıtmalı havuzlarda en yaygın seçenekler ısı pompası ve güneş kollektörüdür; ısı pompası yüksek verim ve düşük işletme maliyetiyle öne çıkar. Kapalı veya yarı kapalı (kış bahçeli) havuz çözümleri dört mevsim kullanımı mümkün kılar. Çilek Havuz Teknik Ekibi, bölgenizin iklim verilerine ve kullanım sıklığınıza göre en verimli ısıtma çözümünü önerir.

Çilek Havuz Technical Team

Evet, keşif tamamen ücretsizdir. Telefon, WhatsApp veya form üzerinden talebinizi ilettiğinizde Çilek Havuz Teknik Ekibinden bir mühendis belirlenen günde bahçenizi ziyaret eder; zemin, boyut ve bağlantı altyapısını yerinde değerlendirir. Keşiften ortalama 3–5 iş günü içinde proje özelinde kalem kalem şeffaf yazılı teklif gönderilir.

Çilek Havuz Technical Team

Teorik olarak mümkün olmakla birlikte, kendi kendine yapım ciddi riskler taşır: zemin etüdü olmadan başlanan projelerde bodrum suyu baskını ve yapısal çatlak, hatalı su yalıtımında havuzun birkaç yıl içinde tamamen boşaltılması, yetersiz filtrasyon kapasitesinde kronik su kalitesi sorunları yaşanabilir. Betonarme ve su yalıtımı işleri sertifikalı ekip gerektirir. Çilek Havuz, 33 yıllık sahadan edindiği uzmanlıkla bu riskleri keşif aşamasında öngörür ve uçtan uca yönetir.

Çilek Havuz Technical Team

Betonarme havuzlarda en yaygın kaplama seçenekleri cam mozaik, seramik, doğal taş (traverten, bazalt, granit) ve havuz boyasıdır. Cam mozaik görsel zenginlik ve uzun ömür sunar; doğal taş ise luxury segment projelerde öne çıkar. Prefabrik havuzlarda ise fabrikasyon liner veya jelkot kaplama standart olarak gelir. Çilek Havuz Teknik Ekibi, estetik tercihiniz, bütçeniz ve havuz yapısına göre en uygun kaplama malzemesini önerir.

Çilek Havuz Technical Team

Düzgün filtre ve kimyasal dengeyle yönetilen bir havuzun suyu 3–5 yılda bir tamamen değiştirilir; bazı durumlarda daha da uzun süre dayanır. Havuzda koku, görünür tortu veya kimyasal dengenin düzeltilemez bozulması gibi işaretler erken tahliyeyi gerektirebilir. Otomasyon sistemleri ve düzenli su analizi ile bu süreçler kolayca takip edilir.

Çilek Havuz Technical Team

Havuz yapımında beton, C25/C30 sınıfı ve su geçirimliliği düşük özel formülasyonla kullanılır. Yapı demiri için BS500B nervürlü çelik, su yalıtımı için kristalize kaplama veya PVC membran sistemler tercih edilir. Kaplama malzemeleri havuz suyunun asidik ve klorlu ortamına dayanıklı olmalıdır. Çilek Havuz, TS EN standartlarına uygun malzemelerle çalışır ve her proje için kullanılan malzemeleri belgelendirerek teslim eder.

Çilek Havuz Technical Team

Evet, betonarme havuz yapımı yıl boyunca uygulanabilir; kış aylarında don etkisi beton dökümünü kısıtlayabilse de Çilek Havuz gerektiğinde sıcak tutma uygulamaları ve kür süreçleriyle çalışmaya devam eder. Kış inşaatının avantajı ekip ve malzeme mevcudiyetinin yaz sezonuna göre daha esnek olmasıdır; havuzunuzu yaz başında kullanmak istiyorsanız kış döneminde başlamak ideal bir takvimdir.

Çilek Havuz Technical Team

Enerji verimliliği için Çilek Havuz üç temel uygulamayı önerir: (1) inverter ısı pompası — düşük elektrik tüketimiyle yüksek ısıtma kapasitesi, (2) LED havuz aydınlatması — geleneksel halojen lambalara kıyasla %80'e kadar enerji tasarrufu, (3) havuz örtüsü — geceleri ısı kaybını ve buharlaşmayı büyük ölçüde azaltır. Bu kombinasyonla yıllık işletme maliyetleri önemli ölçüde düşer.

Çilek Havuz Technical Team

Bahçe havuzu için genel bir minimum ölçü standardı yoktur; ancak işlevsel bir yüzme havuzu için genellikle en az 5×3 m (15 m²) yüzey alanı ve makine dairesi için ek alan hesaba katılır. Dar veya eğimli parsellerde taşmalı sistem yerine skimmerli sistemler tercih edilir. Çilek Havuz Teknik Ekibi, 20 m²'nin altındaki bahçelerde de alanı verimli kullanan kompakt havuz çözümleri üretir.

Çilek Havuz Technical Team

News from Us

Opening field knowledge to everyone.

All articles
Overflow pool or skimmer pool: how the two systems differPool Construction

Overflow pool or skimmer pool: how the two systems differ

In a skimmer pool the water sits 10-15 cm below the coping. In an overflow pool the water is level with the coping and runs into a perimeter channel and balance tank. Here is what changes in cost, plant room size and day-to-day running.

4 Eylül 20265 min read
2026 Pool Construction Cost: Per m² and Itemized BudgetPool Construction

2026 Pool Construction Cost: Per m² and Itemized Budget

How is 2026 pool construction cost calculated? We explain what a per-square-meter price really includes, the hidden items, and the total cost of ownership from an engineer's view.

22 Temmuz 20263 min read
Pool Permit & License 2026: Documents and ApplicationPool Construction

Pool Permit & License 2026: Documents and Application

Which documents are needed for a pool permit and license? We explain the required paperwork, municipal approval steps and the application process for 2026.

16 Temmuz 20262 min read
Rooftop & Terrace Pools: Structure, Load and WaterproofingPool Construction

Rooftop & Terrace Pools: Structure, Load and Waterproofing

Can you build a pool on a terrace or rooftop? We explain load calculation, structural reinforcement, waterproofing and seismic load as critical engineering topics.

13 Temmuz 20262 min read
Pool Waterproofing: Materials, Layers and Testing GuidePool Construction

Pool Waterproofing: Materials, Layers and Testing Guide

How is pool waterproofing done? We explain which material suits which pool, the correct layer sequence and how to run a water-holding test from an engineer's view.

10 Temmuz 20262 min read
Pool Lighting: LED Selection, Safety and PlacementTechnology

Pool Lighting: LED Selection, Safety and Placement

How to choose pool LED lighting? We explain underwater fixture safety, IP rating, low-voltage transformers and correct placement from an engineer's perspective.

7 Temmuz 20262 min read