We manage pool construction from design and permits through to handover, under one roof.

Get a Quote
Travertine-clad concrete villa pool with an overflow edge, an in-pool lounger platform and stepping stones

Shell construction

Week 1-3
  1. 01
  2. 02
  3. 03
  4. 04

Pool construction at a glance

We run pool construction with one team, from design and permits to excavation and handover.

We draw the architectural, structural and electrical projects and follow the municipal process; we give the construction schedule in writing after the site survey and a 2-year warranty on workmanship.

Year founded
1998
Years in the sector
33+
Weeks build time
6-8
Years workmanship warranty
2

// 01 · Decision

Pool construction starts with the site survey, and one team carries it through to handover.

We handle the pool project, the permit, shell and finish works, mechanical installation and commissioning. We have been in the sector since 1993 and run this whole chain with our own team.

  1. 01

    Pool use: villa, hotel or training pool

    A villa pool, hotel pool, residential estate pool and training pool each need a different size, depth and filtration. Who will use the pool, how often and in which season is the first input of the pool project.

  2. 02

    What the ground and plot allow for the pool

    A pool soil survey measures bearing capacity, groundwater and slope; the structural design of a concrete pool is made with this data. The plant room position and machinery access to the garden are also settled at the site visit.

  3. 03

    Permit requirement for the pool

    A pool permit depends on the zoning status of the plot and on the pool's position and size. We draw the architectural, structural and electrical pool projects and run the municipal application and permit process ourselves.

  4. 04

    Buildability, system and size of the pool

    Pool feasibility settles the system (concrete, prefabricated or polyester), the pool size and depth, a sample budget and the construction schedule together. We give the decision after the site visit with a written, itemised quotation.

// 01 · Systems

There are six pool systems, we choose the right one together.

In a concrete pool the water system is free: skimmer, overflow, hidden overflow or infinity. Prefabricated and ready-made pools work with skimmers. Below you can see the section, construction time and lifespan of each type; we make the final decision together at the site visit.

Pool types
Skimmer concrete pool

01 / 06

Skimmer concrete pool

The most common system for residential pools.

Structure
Concrete
Water system
Skimmer
Construction time
Written schedule
Lifespan
20+ years

Built with a C35 reinforced concrete shell, waterproofing and finish. The water sits below the coping; surface debris is drawn to the filter through skimmer mouths in the wall. Size, depth and shape are free and no balance tank is needed.

Best suited toVilla and garden pools

Read more: Skimmer concrete pool

The most common system for residential pools.

Skimmer concrete pool
Structure
Concrete
Water system
Skimmer
Construction time
Written schedule
Lifespan
20+ years

Built with a C35 reinforced concrete shell, waterproofing and finish. The water sits below the coping; surface debris is drawn to the filter through skimmer mouths in the wall. Size, depth and shape are free and no balance tank is needed.

Best suited toVilla and garden pools

Read more: Skimmer concrete pool

// 01 · Quantities

Enter the size, we calculate excavation, concrete and water.

Enter the pool type, size and depth; excavation, floor and wall concrete, rebar, water volume and lining area are calculated instantly. Final quantities come from the structural project.

Pool type

Length10.0 m
Width5.0 m
Shallow end1.2 m
Deep end1.6 m

Edge section

Skimmer mouth▽ ±0,151.20-1.60 m
Quantities: Skimmer concrete pool, 10.0 × 5.0 m
ItemQuantity
Excavation160.5 m³
Blinding concrete5.9 m³
Floor slab concrete17.8 m³
Wall concrete13.1 m³
Total concrete30.9 m³
Reinforcement (rebar)3.09 ton
Water volume62.5 m³ · 62,500 L
Lining area92.0 m²
Coping length30.0 m
Filtration flow (4-6 h turnover)10-16 m³/h

Materials at October 2026 prices

C30 ready-mix concrete
97,000-104,000 TL
Rebar
121,000-122,000 TL

Assumptions: concrete wall and floor 30 cm, 60 cm working space on each side, 10 cm blinding and 20 cm gravel under the floor, rebar about 100 kg/m³. Concrete price ex-plant, excluding VAT.

Quantities for common pool sizes

We calculated common sizes with the calculator's formula: a reinforced concrete skimmer pool, 1.2 m deep at the shallow end and 1.6 m at the deep end; the Olympic pool is 50 × 25 m with a depth of 2 m. Final quantities come from the structural design.

SizeWater volumeExcavationTotal concreteLining areaFiltration flow (4-6 h turnover)
8.0 × 4.0 m32 m² · 1.2-1.6 m40 m³114 m³22.5 m³66 m²7-10 m³/h
6.0 × 5.0 m30 m² · 1.2-1.6 m38 m³106 m³20.8 m³61 m²6-9 m³/h
10.0 × 5.0 m50 m² · 1.2-1.6 m63 m³160 m³30.9 m³92 m²10-16 m³/h
12.5 × 8.0 m100 m² · 1.2-1.6 m125 m³280 m³51.5 m³157 m²21-31 m³/h
50.0 × 25.0 mOlympic pool · 1,250 m² · 2.0 m2,313 m³3,609 m³479.3 m³1,550 m²385-578 m³/h

// 01 · Design and catalogues

Set up your project on screen first, then review the products in our catalogues.

In the design studio you can build your space with its materials and colours; in the product catalogues you can see models, technical sheets and list prices.

Long villa pool with a travertine edge and olive trees at sunsetPool

Design studio

Build your pool, sauna, steam room or Turkish hammam on screen with lining, timber and marble options, then request a quote with your selection.

Where would you like to start?

Product catalogues

Models, technical sheets and list prices of our product groups are on the category pages.

// Reading plan

Before you decide, read these six short articles.

The order follows the natural course of a pool decision: the whole path first, then the structure, permit, plumbing and cost.

  1. Building a pool from scratch

    The whole path of a pool, from site visit to handover, in one article.
    9 min

    Short answer

    A pool built from scratch starts with a site visit, followed by design and permit, shell works, finishing works and commissioning. The construction schedule is given in writing after the site survey.

  2. Pool construction stages

    The order and duration of every stage from excavation to first fill.
    10 min

    Short answer

    After the permit the pool progresses in four phases. The schedule for a 10 × 5 m concrete pool:

    1. 01Shell constructionWeek 1-3Excavation, reinforcement, C35 concrete shell
    2. 02Finishing worksWeek 4-64-coat waterproofing, finish, mechanical installation
    3. 03HandoverWeek 7-8Filling, leak check, commissioning
    4. 04First nightWeek 8Underwater lighting, heating, automation
  3. Concrete or prefabricated pool

    Lifespan, schedule and budget differences of the two structures.
    9 min

    Short answer

    A concrete pool lasts over 20 years; size, shape and water system are free. A prefabricated pool is installed faster, lasts 5-10 years and its size depends on the panel system.

  4. Pool permit and approval

    Which pools need a permit and how the application runs.
    9 min

    Short answer

    Whether a permit is needed depends on the zoning status of the plot and the pool's position and size. We draw the architectural, structural and electrical projects and run the municipal application ourselves.

  5. Pool plumbing and plant room

    How filter, pump and pipework are built together with the pool.
    9 min

    Short answer

    Pipework is embedded in the concrete during the shell works, and the filter and pump are installed in the plant room. Equipment is sized to the pool's water volume.

  6. What determines pool cost

    Why quotations differ and which decisions change the budget.
    9 min

    Short answer

    Size and depth, the water system, the lining material, the ground and access change the amount most. A 10 × 5 m concrete pool costs 1,850,000 TL in October 2026 (excluding VAT).

    10 × 5 × 1.5 m skimmer concrete pool, October 2026
    Item
    Pool shell construction costExcavation and spoil removal, blinding concrete, reinforcement, C35 reinforced concrete floor and walls, plumbing sleeves. The structural shell of the pool is built in this item; the amount grows with the shell area.
    Pool finishing costLevelling render, layered waterproofing, mosaic or ceramic lining, grouting, coping stones and the surrounding deck. The choice of lining material is the decision that changes this item most.
    Pool mechanical installation costFilter and pump set, pipework and valves, plant room, pool lighting and the automation panel. Equipment is sized to the water volume; the amount grows with the volume.
    Total, excl. VAT
    October 2026 concrete and rebar prices
    C30 ready-mix concrete
    Ribbed rebar Ø12-32
    Ribbed rebar Ø8

    Market average. Concrete is ex-plant and excludes VAT; prices vary by region, transport and order volume. In the quotation we calculate with current unit prices.

Items that change the amount

  • Size and depth

    As the shell surface and water volume grow, shell, finishing and mechanical items rise together.

  • System

    Overflow and infinity pools require a balance tank and additional pipework.

  • Finish

    Glass mosaic, ceramic and natural stone differ in material and labour cost.

  • Mechanical equipment

    The class of filter, pump and automation is chosen according to pool volume.

  • Ground and access

    Rocky ground, slope and access to the site affect the shell works.

  • Heating

    A heat pump or solar collector is added as a separate item.

Showroom

Plan a showroom visit

At our showroom in Çilek Plaza, Sancaktepe, you can discuss your project with our team. We recommend booking an appointment by phone before your visit.

Working Hours

  • Monday to Friday · 08:00-17:30
  • Saturday · 08:00-12:30
  • Closed on Sunday
Directions
Shell construction stage of a reinforced concrete pool, rebar and formwork

// 03 · Design and permit

We draw the pool project, and we obtain the permit.

A pool permit is applied for at the municipality with the architectural, structural and electrical designs. Our own team draws all three and runs the process from the zoning review to the permit. During the site survey we only ask you for the title deed and plot details. A pool built without a permit risks a demolition order or an annotation on the title deed.

Pools that need a permit

Whether a pool needs a permit depends on its location, its size and the zoning status of the plot. We review the zoning status together during the site survey; if a permit is required, we draw the designs for the application and submit the file to the municipality ourselves.

Documents submitted to the municipality

Architectural project
The pool's position on the plot, its dimensions, levels and relation to its surroundings; the base drawing of the municipal application.
Structural project
The calculation of the pool shell against ground and water loads; concrete class, bar diameter and spacing come from this project.
Electrical project
Pump, lighting and heating lines, earthing and residual current protection; the pool's electrics are installed to this project.

Six steps from application to permit

  1. Site visit and review of the zoning status
  2. Drawing the architectural, structural and electrical projects
  3. Municipal application and file follow-up
  4. Obtaining the pool permit
  5. Building according to the projects
  6. Handover and user briefing

// 03 · Stages

Site work runs in four phases, each with a clear output.

Site time after the permit depends on the pool type, size and ground; it is given in the written project schedule after the site survey. The design and permit period varies by municipality. Excavation, C35 concrete, 4-layer waterproofing, mechanical installation, finish and the leak test run on one schedule; we do not shorten curing and test days.

  1. Design and permit

    Site survey, size and system selection, architectural, structural and electrical design, application

    Deliverable:Approved design and pool permit

  2. Shell works

    Excavation, reinforcement, C35 reinforced concrete shell

    Deliverable:Cured reinforced concrete shell

  3. Finishing works

    4-layer waterproofing, finish, mechanical installation

    Deliverable:Finished pool with connected installation

  4. Handover

    Filling, leak check, commissioning

    Deliverable:Documents, user briefing, warranty

The twelve steps in detail

Preliminary Survey & Feasibility · 01/12

01 / 12

Preliminary Survey & Feasibility

Free Online Pre-Consultation

The Çilek Havuz technical team begins your project by listening to you in an online meeting. The current state of the site, intended use, your expectations and the applicable technical conditions are evaluated together.

At this stage we clarify the pool's location, approximate dimensions, indoor or outdoor preference, plant-room position, drainage needs and budget frame. Critical topics such as ground bearing capacity, groundwater level, zoning status and distances to neighbouring structures are covered within the preliminary feasibility study.

The goal is to determine the right system, the right cost range and a workable roadmap before the project begins.

  • Site dimensions and intended use
  • Indoor / outdoor pool preference
  • Ground bearing capacity
  • Drainage and groundwater conditions
  • Plant-room location
  • Zoning and permit requirements
  • Pool type and usage capacity
  • Preliminary budget and build scenario

Why it matters

In pool projects that start without a proper feasibility study, mistakes in ground conditions, drainage, plant-room or capacity can lead to serious costs later on. At Çilek Havuz we review the technical picture with you at the very first stage and set the project on solid ground.

// 03 · Transformation

The change on site, from construction to handover.

Two frames of a villa pool taken from the same angle. Drag the line to compare the shell stage with the handover.

Villa Pool, After: A villa garden still at rough-construction stage was transformed into a living space woven into the
Villa Pool, Before: A villa garden still at rough-construction stage was transformed into a living space woven into the
BeforeAfterDrag to compare

Project Specifications

Villa Pool

A villa garden still at rough-construction stage was transformed into a living space woven into the architecture, with a hidden overflow system and a water surface resolved flush with the deck.

Structure
Concrete
System
Hidden Overflow
Delivery
Turnkey
Filter, pump and electromechanical installation in a pool plant room

// 04 · Mechanical system

Filter and pump, are sized to the pool volume.

Pool water is pumped through the filter, disinfected and returned to the pool. Pump and filter capacity are chosen according to pool volume; a low flow rate means chronic green water and rising chemical consumption. In overflow and infinity pools the overflowing water is collected in the balance tank. Heating, lighting and automation are connected to the same plant room.

  • Filtration

    Sand, glass or zeolite media filters the water on every cycle; the tank diameter is chosen by volume.

  • Pump

    The flow rate is calculated together with the filter according to pool volume.

  • Balance tank

    In overflow and infinity pools the overflowing water is collected here and returned to the system.

  • Heating and lighting

    Heat pump, underwater lighting and automation are connected to the plant room.

// 04 · Finish

Lining comes last, and defines look and lifespan.

Glass mosaic, ceramic, natural stone and pool paint are used in concrete pools. Glass mosaic is long-lasting and offers many colour options; natural stone is heavier, and both its material and its labour cost more. In a prefabricated pool the surface comes from the factory as a liner or gelcoat. We apply the finish over the waterproofing once the 4-layer waterproofing is complete.

  • Glass mosaic

    Long-lasting, with a wide choice of colours and patterns.

  • Ceramic

    Widely used in concrete pools thanks to its range of sizes and patterns.

  • Natural stone

    Travertine, basalt and granite; heavy, with higher material and labour cost.

  • Liner and gelcoat

    In a prefabricated pool the surface arrives ready from the factory.

// 04 · Products

The products we use in pools, priced together in one basket.

We have grouped the products we use in pool construction into construction and maintenance: 150 construction products in 8 categories and 138 maintenance products in 5 categories. Prefabricated pool models, Olympic pool equipment and finishing systems are also in these groups. Each category opens its own page; you can add the products you choose to the quote basket and include them in your pool quote.

Construction of the MSB Riva training pool, 10 m deep, Istanbul

// 05 · Institutional scale

Olympic and training pools, built to specification.

An Olympic pool is 50 m long and 25 m wide, with 10 lanes of 2.5 m each. A semi-Olympic pool is 25 m long; at 12.5 m wide it takes 5 lanes. A training pool requires depth and equipment according to its purpose. For the training centre of a public institution we built a diving training pool 10 m deep with a volume of 3,600 m³.

Olympic, semi-Olympic and training pool dimensions

PoolSizeLanes
Olympic pool50 × 25 m10 lanes
Semi-Olympic pool25 × 12.5 m5 lanes
Training poolBy purposeBy specification

MSB Riva 10 m training pool

// 05 · Projects

The pools we have handed over, are in use on site today.

From our completed projects, we have gathered the pool construction projects here with their year, type and location. From a thermal hotel to the hotel project in Algeria, from residence pools to overflow, infinity and prefabricated villa pools, each card opens its own project page.

// 05 · Service regions

Across Türkiye and abroad, we build pools with the same team.

City and country pages explain pool construction by local climate, ground and permit process. Our branches are in Kyrgyzstan, Egypt, Algeria and Iraq.

// 06 · After handover

Handover is not the end, warranty and maintenance continue.

We give a 2-year warranty on the construction workmanship; for products such as pumps and filters the manufacturer's warranty applies. At handover we brief you on use and hand over the documents together. In our pool maintenance service, water balance, filter and equipment are checked on periodic visits; we also take on the seasonal opening and closing.

// 06 · Services

The work around the pool, is run by the same team.

Alongside pool construction we also take on villa, hotel and spa pools, decorative pools, landscaping and periodic maintenance. Design and consultancy start with a site survey in all of these. We work across Türkiye and abroad; you can find the list of regions on the service areas page.

1-12 of 12 services

Prepared and technically reviewed by: Ali SAVAŞ, Project Manager · Mechatronics Engineer

// 07 · Questions

Questions asked before building a pool, answered in one place.

Çilek Havuz Corporate

Pool & Wellness Engineering

Response Time
Same day
Channels
Phone · Email · WhatsApp

If the answer you are looking for is not here, send your question directly to us and our team will reply as soon as possible.

+90 216 475 39 37

It depends on the pool's location, its size and the zoning status of the plot. We review the zoning status together during the site survey; we draw the architectural, structural and electrical designs and run the entire municipal process, including the pool permit. Where a permit is required, we start work on site only after it has been granted.

Çilek Havuz Corporate

The application is made with the architectural, structural and electrical designs. The architectural design shows the pool's position on the plot, its dimensions and levels; the structural design shows the concrete class and reinforcement of the shell; the electrical design shows the pump, lighting and heating lines. We only ask you for the title deed and plot details, and our team prepares the rest of the file.

Çilek Havuz Corporate

Our own team draws the architectural, structural and electrical designs. The designs are prepared according to the ground, slope and intended use measured during the site survey; the municipal application and the construction run on the same drawings. This way no information is lost between the designer and the builder, and every decision on site rests on the design.

Çilek Havuz Corporate

The two terms are often used interchangeably, but their scope differs. Pool manufacturing is the production of the pool body: in a concrete pool the shell is formed on site with formwork and reinforcement, in a prefabricated pool the body is made in the factory. Pool construction also covers design, permit, mechanical installation, finish and commissioning; we run both with one team.

Çilek Havuz Corporate

Site time after the permit depends on the pool type, size and ground; it is given in the written project schedule after the site survey. Excavation, reinforced concrete, waterproofing, finish and mechanical installation run on one schedule. We do not shorten the days set aside for concrete curing and the waterproofing test; rushed waterproofing leaks later.

Çilek Havuz Corporate

A concrete pool with correct structural design and waterproofing is used for decades. The shell of a prefabricated pool is made in a factory; its service life depends on the shell material and on the shell being bedded correctly in the ground. In both systems, what really extends the life of a pool is regular maintenance of the water chemistry and equipment after handover.

Çilek Havuz Corporate

The 2026 construction price of a 10 × 5 m concrete pool, 1.5 m deep, is 1,850,000 TL excluding VAT. A prefabricated pool of the same size costs 1,480,000 TL, an infinity pool 2,500,000 TL. The amount includes shell works, finishing works and the mechanical installation; the finish class, ground and site access are confirmed during the site survey and itemised in the written quote.

Çilek Havuz Corporate

Size and depth, construction type, skimmer or overflow system, finish, mechanical equipment, ground conditions and surrounding landscaping. Two pools of the same size can end up with very different budgets because of ground and access; that is why we do not give a single figure before the site survey. After the survey an itemised written quote is prepared.

Çilek Havuz Corporate

One edge of an infinity pool is built as an overflow edge, and the overflowing water is collected in a balance tank. This edge, the tank and the additional pipework can only be built in a concrete structure; this is why it costs 1.35 times a concrete pool of the same size. On sloping plots facing the view, excavation and structural calculation also affect the amount.

Çilek Havuz Corporate

A skimmer system is more economical and needs less space. In an overflow system the water is level with the coping, the surface flows continuously into the overflow channel and a balance tank is required; it can only be built in a concrete structure. The intended use, budget and architecture decide the choice; during the site survey we assess both against your plot together.

Çilek Havuz Corporate

A villa garden often needs only around 20 m² for a functional pool. In smaller gardens we plan at least 5 × 3 m of water surface plus room for the plant room; our sample depths are 1.4 to 1.6 m. During the site survey we measure the slope, the bearing capacity of the ground and the plant room location, and set the layout accordingly.

Çilek Havuz Corporate

An Olympic pool is built 50 m long and 25 m wide and takes 10 lanes, each 2.5 m wide. Depth, starting blocks and water temperature are set by the competition specification. At this scale filtration, the balance tank and the plant room are calculated very differently from a residential pool; we draw the design according to the institution's specification.

Çilek Havuz Corporate

A semi-Olympic pool is built 25 m long and takes 5 lanes at a width of 12.5 m. It is used as a training pool in school, sports facility and hotel projects. The number of lanes can be increased with the width; depth and equipment are set in the design according to whether the pool is used for training or competition.

Çilek Havuz Corporate

A training pool requires depth and equipment according to its purpose. For diving, rescue or swimming training the size comes from the institution's specification. In a swimming pool, size and depth are chosen for the users' comfort. In a deep training pool the water pressure, waterproofing and safety calculations differ greatly from a residential pool; we draw the structural design for that load.

Çilek Havuz Corporate

Yes. Our deepest project is the 10-metre-deep diving training pool we built for the training centre of a public institution; it is the deepest training pool in Türkiye. At that depth the water pressure, waterproofing and safety calculations are very different from a villa pool. In villa and hotel projects we apply the required depth with the same calculations.

Çilek Havuz Corporate

A concrete pool can be built all year round. On frosty days concrete pouring is postponed, or the concrete is kept warm and the curing period is extended. In winter, crews and materials are easier to find than in summer. To those who want to use their pool at the start of summer, we recommend starting work in winter, taking the design and permit period into account.

Çilek Havuz Corporate

Yes, every pool project should start with a ground assessment. In projects started without soil analysis, flooding, structural cracks and uplift of the floor are common problems. During the site survey we assess the bearing capacity of the ground and the slope of the land, and we draw the structural design with this information.

Çilek Havuz Corporate

The most common mistakes are skipping the ground survey, cheap waterproofing and filtration that is too small for the pool volume. Starting without a permit, sizing the pool only for summer use and leaving the scope to verbal promises also prove costly later. We clarify each of these together during the site survey and in the written quote.

Çilek Havuz Corporate

Sand, glass and zeolite are the three common filter media; the choice depends on the clarity you expect. Quartz sand holds particles of about 20-40 microns, glass media 9-15 microns, zeolite 3-5 microns. Sand is economical but is renewed every 5-7 years; glass uses less water in backwashing, and zeolite gives the finest filtration at the highest cost.

Çilek Havuz Corporate

Glass mosaic, ceramic, natural stone (travertine, basalt, granite) and pool paint are used in concrete pools. In heavily used hotel and public pools durability comes first; in a villa pool colour and texture often lead. In prefabricated pools a liner or gelcoat surface comes from the factory. We choose the finish together according to the structure, use and budget.

Çilek Havuz Corporate

Yes; the two most common heating options are the heat pump and the solar collector. In most of Türkiye the water drops below 15 °C between October and April, and an unheated pool is not used in those months. The lines for underwater lighting are drawn into the electrical design from the start; we calculate the heating capacity according to the regional climate and how often the pool is used.

Çilek Havuz Corporate

Our warranty on construction workmanship is 2 years; for equipment such as pumps and filters the manufacturer's own warranty applies. After handover our pool maintenance service can take over: water balance, filter and equipment are checked on periodic visits, and the seasonal opening and closing are part of the service.

Çilek Havuz Corporate

Yes, it is free. When a request comes in by phone, WhatsApp or the form, one of our engineers visits on the agreed day and inspects the ground, size, water and electricity connections on site. After the survey an itemised written quote is sent within 3-5 working days on average.

Çilek Havuz Corporate

We build pools across Türkiye and abroad. Istanbul's clay soil, Antalya's limestone bedrock, the granite formation of the Aegean coast and the frost depth of Central Anatolia call for different engineering solutions; we assess the ground on site during the survey and choose the system for the region. The list of regions is on the service areas page.

Çilek Havuz Corporate

Scope, material class, warranty period and handover date should be stated clearly in a written contract. Verbal agreements do not hold in a dispute. We prepare our quote item by item in writing, and we write the concrete class, waterproofing layers, equipment list and the 2-year workmanship warranty into the contract.

Çilek Havuz Corporate

Next step

Let us discuss your project in the way that suits you best.

You can fill in the form for a written quote, schedule a video project presentation or ask us to survey your project site.

  • Get a Quote

    Send us your dimensions and expectations in writing.

  • Online presentation

    Video project presentation

  • On-site survey

    Inspection at your project site

// 08 · Company & Contact

To talk about your project, call or write to us.

Legal Name

Çilek Havuz

Founded

1998 · Istanbul

Head Office

Çilek Plaza, Eyüp Sultan Mah. Yakacık Cd. Feshane Cd. No: 2 D:4 D:1, 34885 Sancaktepe / İstanbul

Service Area

All of Türkiye · exports to 14 countries

Branches

Kyrgyzstan · Egypt · Algeria · Iraq

Showroom

Plan a showroom visit

At our showroom in Çilek Plaza, Sancaktepe, you can discuss your project with our team. We recommend booking an appointment by phone before your visit.