Pool construction
We manage pool construction from design and permits through to handover, under one roof.

Concrete villa pool · 10 × 5 m
01 / 04
Shell construction
Week 1-3- 01
- 02
- 03
- 04
Pool construction at a glance
We run pool construction with one team, from design and permits to excavation and handover.
We draw the architectural, structural and electrical projects and follow the municipal process; we give the construction schedule in writing after the site survey and a 2-year warranty on workmanship.
- Year founded
- 1998
- Years in the sector
- 33+
- Weeks build time
- 6-8
- Years workmanship warranty
- 2
// 01 · Decision
Pool construction starts with the site survey, and one team carries it through to handover.
We handle the pool project, the permit, shell and finish works, mechanical installation and commissioning. We have been in the sector since 1993 and run this whole chain with our own team.

01
Pool use: villa, hotel or training pool
A villa pool, hotel pool, residential estate pool and training pool each need a different size, depth and filtration. Who will use the pool, how often and in which season is the first input of the pool project.
02
What the ground and plot allow for the pool
A pool soil survey measures bearing capacity, groundwater and slope; the structural design of a concrete pool is made with this data. The plant room position and machinery access to the garden are also settled at the site visit.
03
Permit requirement for the pool
A pool permit depends on the zoning status of the plot and on the pool's position and size. We draw the architectural, structural and electrical pool projects and run the municipal application and permit process ourselves.
04
Buildability, system and size of the pool
Pool feasibility settles the system (concrete, prefabricated or polyester), the pool size and depth, a sample budget and the construction schedule together. We give the decision after the site visit with a written, itemised quotation.
// 01 · Systems
There are six pool systems, we choose the right one together.
In a concrete pool the water system is free: skimmer, overflow, hidden overflow or infinity. Prefabricated and ready-made pools work with skimmers. Below you can see the section, construction time and lifespan of each type; we make the final decision together at the site visit.

01 / 06
Skimmer concrete pool
The most common system for residential pools.
- Structure
- Concrete
- Water system
- Skimmer
- Construction time
- Written schedule
- Lifespan
- 20+ years
Built with a C35 reinforced concrete shell, waterproofing and finish. The water sits below the coping; surface debris is drawn to the filter through skimmer mouths in the wall. Size, depth and shape are free and no balance tank is needed.
Best suited toVilla and garden pools
Read more: Skimmer concrete poolThe most common system for residential pools.

- Structure
- Concrete
- Water system
- Skimmer
- Construction time
- Written schedule
- Lifespan
- 20+ years
Built with a C35 reinforced concrete shell, waterproofing and finish. The water sits below the coping; surface debris is drawn to the filter through skimmer mouths in the wall. Size, depth and shape are free and no balance tank is needed.
Best suited toVilla and garden pools
Read more: Skimmer concrete pool
01 / 06Skimmer concrete pool
- Structure
- Concrete
- Water system
- Skimmer
- Construction time
- Written schedule
- Lifespan
- 20+ years
Built with a C35 reinforced concrete shell, waterproofing and finish. The water sits below the coping; surface debris is drawn to the filter through skimmer mouths in the wall. Size, depth and shape are free and no balance tank is needed.
Best suited toVilla and garden pools
Read more: Skimmer concrete poolOverflow concrete pool
- Structure
- Concrete
- Water system
- Overflow
- Construction time
- Written schedule
- Lifespan
- 20+ years
The water sits level with the coping and overflows into the surrounding grated channel, which sends it to a balance tank and then to the filter. It gives an unbroken water surface and better surface cleaning; space is needed for the balance tank.
Best suited toHotel, residential estate and public pools
Read more: Overflow concrete poolHidden overflow pool
- Structure
- Concrete
- Water system
- Hidden overflow
- Construction time
- Written schedule
- Lifespan
- 20+ years
The grate-free form of the overflow system. The edge stones overhang a concealed channel; water slips through a thin slot between stone and deck into the channel and on to the balance tank. The surface reads as an unbroken mirror; it needs precise levels and a concrete structure.
Best suited toArchitectural villas and boutique hotels
Read more: Hidden overflow poolInfinity edge pool
- Structure
- Concrete
- Water system
- Infinity
- Construction time
- Written schedule
- Lifespan
- 20+ years
One edge is a lowered weir; water flows over it into a catch channel below and merges with the view. It is chosen on sloping plots with a view and needs precise levels and a concrete structure.
Best suited toSloping plots with a view
Read more: Infinity edge poolSkimmer prefabricated pool
- Structure
- Prefabricated panel
- Water system
- Skimmer
- Construction time
- Written schedule
- Lifespan
- 5-10 years
Factory-made steel panels are joined on a concrete foundation and the interior is finished with a liner. Water is drawn to the filter through skimmer mouths. It is installed quickly; size and shape depend on the panel system.
Best suited toGarden pools on a short schedule
Read more: Skimmer prefabricated poolReady-made pool
- Structure
- One-piece polyester
- Water system
- Skimmer
- Construction time
- Written schedule
- Lifespan
- 5-10 years
A one-piece polyester shell is set on a sand bed in the prepared excavation and backfilled around. It is the fastest system to install; size and shape are limited to the factory mould.
Best suited toSmall gardens and short schedules
Read more: Ready-made pool// 01 · Quantities
Enter the size, we calculate excavation, concrete and water.
Enter the pool type, size and depth; excavation, floor and wall concrete, rebar, water volume and lining area are calculated instantly. Final quantities come from the structural project.
Pool type
Edge section
| Item | Quantity |
|---|---|
| Excavation | 160.5 m³ |
| Blinding concrete | 5.9 m³ |
| Floor slab concrete | 17.8 m³ |
| Wall concrete | 13.1 m³ |
| Total concrete | 30.9 m³ |
| Reinforcement (rebar) | 3.09 ton |
| Water volume | 62.5 m³ · 62,500 L |
| Lining area | 92.0 m² |
| Coping length | 30.0 m |
| Filtration flow (4-6 h turnover) | 10-16 m³/h |
Materials at October 2026 prices
- C30 ready-mix concrete
- 97,000-104,000 TL
- Rebar
- 121,000-122,000 TL
Assumptions: concrete wall and floor 30 cm, 60 cm working space on each side, 10 cm blinding and 20 cm gravel under the floor, rebar about 100 kg/m³. Concrete price ex-plant, excluding VAT.
Quantities for common pool sizes
We calculated common sizes with the calculator's formula: a reinforced concrete skimmer pool, 1.2 m deep at the shallow end and 1.6 m at the deep end; the Olympic pool is 50 × 25 m with a depth of 2 m. Final quantities come from the structural design.
| Size | Water volume | Excavation | Total concrete | Lining area | Filtration flow (4-6 h turnover) |
|---|---|---|---|---|---|
| 8.0 × 4.0 m32 m² · 1.2-1.6 m | 40 m³ | 114 m³ | 22.5 m³ | 66 m² | 7-10 m³/h |
| 6.0 × 5.0 m30 m² · 1.2-1.6 m | 38 m³ | 106 m³ | 20.8 m³ | 61 m² | 6-9 m³/h |
| 10.0 × 5.0 m50 m² · 1.2-1.6 m | 63 m³ | 160 m³ | 30.9 m³ | 92 m² | 10-16 m³/h |
| 12.5 × 8.0 m100 m² · 1.2-1.6 m | 125 m³ | 280 m³ | 51.5 m³ | 157 m² | 21-31 m³/h |
| 50.0 × 25.0 mOlympic pool · 1,250 m² · 2.0 m | 2,313 m³ | 3,609 m³ | 479.3 m³ | 1,550 m² | 385-578 m³/h |
// 01 · Design and catalogues
Set up your project on screen first, then review the products in our catalogues.
In the design studio you can build your space with its materials and colours; in the product catalogues you can see models, technical sheets and list prices.
PoolDesign studio
Build your pool, sauna, steam room or Turkish hammam on screen with lining, timber and marble options, then request a quote with your selection.
Where would you like to start?
Product catalogues
Models, technical sheets and list prices of our product groups are on the category pages.
// Reading plan
Before you decide, read these six short articles.
The order follows the natural course of a pool decision: the whole path first, then the structure, permit, plumbing and cost.
Building a pool from scratch
The whole path of a pool, from site visit to handover, in one article.9 minShort answer
A pool built from scratch starts with a site visit, followed by design and permit, shell works, finishing works and commissioning. The construction schedule is given in writing after the site survey.
Pool construction stages
The order and duration of every stage from excavation to first fill.10 minShort answer
After the permit the pool progresses in four phases. The schedule for a 10 × 5 m concrete pool:
- 01Shell constructionWeek 1-3Excavation, reinforcement, C35 concrete shell
- 02Finishing worksWeek 4-64-coat waterproofing, finish, mechanical installation
- 03HandoverWeek 7-8Filling, leak check, commissioning
- 04First nightWeek 8Underwater lighting, heating, automation
Concrete or prefabricated pool
Lifespan, schedule and budget differences of the two structures.9 minShort answer
A concrete pool lasts over 20 years; size, shape and water system are free. A prefabricated pool is installed faster, lasts 5-10 years and its size depends on the panel system.
Pool permit and approval
Which pools need a permit and how the application runs.9 minShort answer
Whether a permit is needed depends on the zoning status of the plot and the pool's position and size. We draw the architectural, structural and electrical projects and run the municipal application ourselves.
Pool plumbing and plant room
How filter, pump and pipework are built together with the pool.9 minShort answer
Pipework is embedded in the concrete during the shell works, and the filter and pump are installed in the plant room. Equipment is sized to the pool's water volume.
What determines pool cost
Why quotations differ and which decisions change the budget.9 minShort answer
Size and depth, the water system, the lining material, the ground and access change the amount most. A 10 × 5 m concrete pool costs 1,850,000 TL in October 2026 (excluding VAT).
10 × 5 × 1.5 m skimmer concrete pool, October 2026 Item Pool shell construction costExcavation and spoil removal, blinding concrete, reinforcement, C35 reinforced concrete floor and walls, plumbing sleeves. The structural shell of the pool is built in this item; the amount grows with the shell area. %43 Pool finishing costLevelling render, layered waterproofing, mosaic or ceramic lining, grouting, coping stones and the surrounding deck. The choice of lining material is the decision that changes this item most. %32 Pool mechanical installation costFilter and pump set, pipework and valves, plant room, pool lighting and the automation panel. Equipment is sized to the water volume; the amount grows with the volume. %24 Total, excl. VAT 1,850,000 TL October 2026 concrete and rebar prices C30 ready-mix concrete 3,150-3,350 TL / m³ Ribbed rebar Ø12-32 39,000-39,560 TL / ton Ribbed rebar Ø8 41,000-41,560 TL / ton Market average. Concrete is ex-plant and excludes VAT; prices vary by region, transport and order volume. In the quotation we calculate with current unit prices.
Items that change the amount
Size and depth
As the shell surface and water volume grow, shell, finishing and mechanical items rise together.
System
Overflow and infinity pools require a balance tank and additional pipework.
Finish
Glass mosaic, ceramic and natural stone differ in material and labour cost.
Mechanical equipment
The class of filter, pump and automation is chosen according to pool volume.
Ground and access
Rocky ground, slope and access to the site affect the shell works.
Heating
A heat pump or solar collector is added as a separate item.
Showroom
Plan a showroom visit
At our showroom in Çilek Plaza, Sancaktepe, you can discuss your project with our team. We recommend booking an appointment by phone before your visit.
Working Hours
- Monday to Friday · 08:00-17:30
- Saturday · 08:00-12:30
- Closed on Sunday

// 03 · Design and permit
We draw the pool project, and we obtain the permit.
A pool permit is applied for at the municipality with the architectural, structural and electrical designs. Our own team draws all three and runs the process from the zoning review to the permit. During the site survey we only ask you for the title deed and plot details. A pool built without a permit risks a demolition order or an annotation on the title deed.
Pools that need a permit
Whether a pool needs a permit depends on its location, its size and the zoning status of the plot. We review the zoning status together during the site survey; if a permit is required, we draw the designs for the application and submit the file to the municipality ourselves.
Documents submitted to the municipality
- Architectural project
- The pool's position on the plot, its dimensions, levels and relation to its surroundings; the base drawing of the municipal application.
- Structural project
- The calculation of the pool shell against ground and water loads; concrete class, bar diameter and spacing come from this project.
- Electrical project
- Pump, lighting and heating lines, earthing and residual current protection; the pool's electrics are installed to this project.
Six steps from application to permit
- Site visit and review of the zoning status
- Drawing the architectural, structural and electrical projects
- Municipal application and file follow-up
- Obtaining the pool permit
- Building according to the projects
- Handover and user briefing
// 03 · Stages
Site work runs in four phases, each with a clear output.
Site time after the permit depends on the pool type, size and ground; it is given in the written project schedule after the site survey. The design and permit period varies by municipality. Excavation, C35 concrete, 4-layer waterproofing, mechanical installation, finish and the leak test run on one schedule; we do not shorten curing and test days.
Design and permit
Site survey, size and system selection, architectural, structural and electrical design, application
Deliverable:Approved design and pool permit
Shell works
Excavation, reinforcement, C35 reinforced concrete shell
Deliverable:Cured reinforced concrete shell
Finishing works
4-layer waterproofing, finish, mechanical installation
Deliverable:Finished pool with connected installation
Handover
Filling, leak check, commissioning
Deliverable:Documents, user briefing, warranty
The twelve steps in detail

01 / 12
Preliminary Survey & Feasibility
Free Online Pre-Consultation
The Çilek Havuz technical team begins your project by listening to you in an online meeting. The current state of the site, intended use, your expectations and the applicable technical conditions are evaluated together.
At this stage we clarify the pool's location, approximate dimensions, indoor or outdoor preference, plant-room position, drainage needs and budget frame. Critical topics such as ground bearing capacity, groundwater level, zoning status and distances to neighbouring structures are covered within the preliminary feasibility study.
The goal is to determine the right system, the right cost range and a workable roadmap before the project begins.
- Site dimensions and intended use
- Indoor / outdoor pool preference
- Ground bearing capacity
- Drainage and groundwater conditions
- Plant-room location
- Zoning and permit requirements
- Pool type and usage capacity
- Preliminary budget and build scenario
Why it matters
In pool projects that start without a proper feasibility study, mistakes in ground conditions, drainage, plant-room or capacity can lead to serious costs later on. At Çilek Havuz we review the technical picture with you at the very first stage and set the project on solid ground.
// 03 · Transformation
The change on site, from construction to handover.
Two frames of a villa pool taken from the same angle. Drag the line to compare the shell stage with the handover.


Project Specifications
Villa Pool
A villa garden still at rough-construction stage was transformed into a living space woven into the architecture, with a hidden overflow system and a water surface resolved flush with the deck.
- Structure
- Concrete
- System
- Hidden Overflow
- Delivery
- Turnkey

// 04 · Mechanical system
Filter and pump, are sized to the pool volume.
Pool water is pumped through the filter, disinfected and returned to the pool. Pump and filter capacity are chosen according to pool volume; a low flow rate means chronic green water and rising chemical consumption. In overflow and infinity pools the overflowing water is collected in the balance tank. Heating, lighting and automation are connected to the same plant room.
Filtration
Sand, glass or zeolite media filters the water on every cycle; the tank diameter is chosen by volume.
Pump
The flow rate is calculated together with the filter according to pool volume.
Balance tank
In overflow and infinity pools the overflowing water is collected here and returned to the system.
Heating and lighting
Heat pump, underwater lighting and automation are connected to the plant room.
// 04 · Finish
Lining comes last, and defines look and lifespan.
Glass mosaic, ceramic, natural stone and pool paint are used in concrete pools. Glass mosaic is long-lasting and offers many colour options; natural stone is heavier, and both its material and its labour cost more. In a prefabricated pool the surface comes from the factory as a liner or gelcoat. We apply the finish over the waterproofing once the 4-layer waterproofing is complete.
Glass mosaic
Long-lasting, with a wide choice of colours and patterns.
Ceramic
Widely used in concrete pools thanks to its range of sizes and patterns.
Natural stone
Travertine, basalt and granite; heavy, with higher material and labour cost.
Liner and gelcoat
In a prefabricated pool the surface arrives ready from the factory.
// 04 · Products
The products we use in pools, priced together in one basket.
We have grouped the products we use in pool construction into construction and maintenance: 150 construction products in 8 categories and 138 maintenance products in 5 categories. Prefabricated pool models, Olympic pool equipment and finishing systems are also in these groups. Each category opens its own page; you can add the products you choose to the quote basket and include them in your pool quote.

// 05 · Institutional scale
Olympic and training pools, built to specification.
An Olympic pool is 50 m long and 25 m wide, with 10 lanes of 2.5 m each. A semi-Olympic pool is 25 m long; at 12.5 m wide it takes 5 lanes. A training pool requires depth and equipment according to its purpose. For the training centre of a public institution we built a diving training pool 10 m deep with a volume of 3,600 m³.
Olympic, semi-Olympic and training pool dimensions
| Pool | Size | Lanes |
|---|---|---|
| Olympic pool | 50 × 25 m | 10 lanes |
| Semi-Olympic pool | 25 × 12.5 m | 5 lanes |
| Training pool | By purpose | By specification |
MSB Riva 10 m training pool
// 05 · Projects
The pools we have handed over, are in use on site today.
From our completed projects, we have gathered the pool construction projects here with their year, type and location. From a thermal hotel to the hotel project in Algeria, from residence pools to overflow, infinity and prefabricated villa pools, each card opens its own project page.
// 05 · Service regions
Across Türkiye and abroad, we build pools with the same team.
City and country pages explain pool construction by local climate, ground and permit process. Our branches are in Kyrgyzstan, Egypt, Algeria and Iraq.
Türkiye
15Abroad
13- AlgeriaBranch
- EgyptBranch
- IraqBranch
- KyrgyzstanBranch
- France
- Germany
- Kazakhstan
- Libya
- Qatar
- Russia
- Saudi Arabia
- United Arab Emirates
- United Kingdom
// 06 · After handover
Handover is not the end, warranty and maintenance continue.
We give a 2-year warranty on the construction workmanship; for products such as pumps and filters the manufacturer's warranty applies. At handover we brief you on use and hand over the documents together. In our pool maintenance service, water balance, filter and equipment are checked on periodic visits; we also take on the seasonal opening and closing.
// 06 · Services
The work around the pool, is run by the same team.
Alongside pool construction we also take on villa, hotel and spa pools, decorative pools, landscaping and periodic maintenance. Design and consultancy start with a site survey in all of these. We work across Türkiye and abroad; you can find the list of regions on the service areas page.
1-12 of 12 services
Pool ConstructionPrefabricated Pools
Fast-install modular prefabricated pool systems.
View the service- Scope
- Modular, quick to install
Pool ConstructionInfinity Pools
Pools that open onto the view, with water spilling over the edge into a balance tank.
View the service- Scope
- Overflow edge to the view
Pool ConstructionNatural Ponds
Natural-look pond and bio-pool designs.
View the service- Scope
- Natural pond and bio-pool
Pool ConstructionOrnamental Pools
Decorative water features with fountains, cascades and lighting.
View the service- Scope
- Fountains, cascades, light
Pool ConstructionThermal Pools
Durable pool systems built for thermal water.
View the service- Scope
- Built for thermal water
Pool ConstructionAquapark Construction
Water parks with slides for hotels, holiday resorts and municipalities.
View the service- Scope
- Water parks with slides
Care & ConsultingPool Maintenance
Water chemistry, equipment and periodic maintenance.
View the service- Scope
- Water chemistry, equipment
Care & ConsultingLandscape Architecture
Landscape design that unites the pool with its garden and surroundings.
View the service- Scope
- Pool and garden as one
Care & ConsultingPool Consulting
Engineering consulting on project, materials and budget.
View the service- Scope
- Design, materials and cost
Pool ConstructionVilla Pool Construction
Plot slope, privacy, heating and automation decisions.
View the service- Scope
- Slope, privacy, heating
Pool ConstructionHotel and Commercial Pool Construction
Capacity, hygiene rules, maintenance contracts and work while the facility stays open.
View the service- Scope
- Capacity, hygiene, maintenance
Pool ConstructionSpa and Hot Tub Pool Construction
Jet and blower installation, hot water hygiene, humidity and ventilation.
View the service- Scope
- Hydrotherapy and humidity control
Prepared and technically reviewed by: Ali SAVAŞ, Project Manager · Mechatronics Engineer
// 07 · Questions
Questions asked before building a pool, answered in one place.
Çilek Havuz Corporate
Pool & Wellness Engineering
- Response Time
- Same day
- Channels
- Phone · Email · WhatsApp
If the answer you are looking for is not here, send your question directly to us and our team will reply as soon as possible.
+90 216 475 39 37It depends on the pool's location, its size and the zoning status of the plot. We review the zoning status together during the site survey; we draw the architectural, structural and electrical designs and run the entire municipal process, including the pool permit. Where a permit is required, we start work on site only after it has been granted.
Çilek Havuz Corporate
The application is made with the architectural, structural and electrical designs. The architectural design shows the pool's position on the plot, its dimensions and levels; the structural design shows the concrete class and reinforcement of the shell; the electrical design shows the pump, lighting and heating lines. We only ask you for the title deed and plot details, and our team prepares the rest of the file.
Çilek Havuz Corporate
Our own team draws the architectural, structural and electrical designs. The designs are prepared according to the ground, slope and intended use measured during the site survey; the municipal application and the construction run on the same drawings. This way no information is lost between the designer and the builder, and every decision on site rests on the design.
Çilek Havuz Corporate
The two terms are often used interchangeably, but their scope differs. Pool manufacturing is the production of the pool body: in a concrete pool the shell is formed on site with formwork and reinforcement, in a prefabricated pool the body is made in the factory. Pool construction also covers design, permit, mechanical installation, finish and commissioning; we run both with one team.
Çilek Havuz Corporate
Site time after the permit depends on the pool type, size and ground; it is given in the written project schedule after the site survey. Excavation, reinforced concrete, waterproofing, finish and mechanical installation run on one schedule. We do not shorten the days set aside for concrete curing and the waterproofing test; rushed waterproofing leaks later.
Çilek Havuz Corporate
A concrete pool with correct structural design and waterproofing is used for decades. The shell of a prefabricated pool is made in a factory; its service life depends on the shell material and on the shell being bedded correctly in the ground. In both systems, what really extends the life of a pool is regular maintenance of the water chemistry and equipment after handover.
Çilek Havuz Corporate
The 2026 construction price of a 10 × 5 m concrete pool, 1.5 m deep, is 1,850,000 TL excluding VAT. A prefabricated pool of the same size costs 1,480,000 TL, an infinity pool 2,500,000 TL. The amount includes shell works, finishing works and the mechanical installation; the finish class, ground and site access are confirmed during the site survey and itemised in the written quote.
Çilek Havuz Corporate
Size and depth, construction type, skimmer or overflow system, finish, mechanical equipment, ground conditions and surrounding landscaping. Two pools of the same size can end up with very different budgets because of ground and access; that is why we do not give a single figure before the site survey. After the survey an itemised written quote is prepared.
Çilek Havuz Corporate
One edge of an infinity pool is built as an overflow edge, and the overflowing water is collected in a balance tank. This edge, the tank and the additional pipework can only be built in a concrete structure; this is why it costs 1.35 times a concrete pool of the same size. On sloping plots facing the view, excavation and structural calculation also affect the amount.
Çilek Havuz Corporate
A skimmer system is more economical and needs less space. In an overflow system the water is level with the coping, the surface flows continuously into the overflow channel and a balance tank is required; it can only be built in a concrete structure. The intended use, budget and architecture decide the choice; during the site survey we assess both against your plot together.
Çilek Havuz Corporate
A villa garden often needs only around 20 m² for a functional pool. In smaller gardens we plan at least 5 × 3 m of water surface plus room for the plant room; our sample depths are 1.4 to 1.6 m. During the site survey we measure the slope, the bearing capacity of the ground and the plant room location, and set the layout accordingly.
Çilek Havuz Corporate
An Olympic pool is built 50 m long and 25 m wide and takes 10 lanes, each 2.5 m wide. Depth, starting blocks and water temperature are set by the competition specification. At this scale filtration, the balance tank and the plant room are calculated very differently from a residential pool; we draw the design according to the institution's specification.
Çilek Havuz Corporate
A semi-Olympic pool is built 25 m long and takes 5 lanes at a width of 12.5 m. It is used as a training pool in school, sports facility and hotel projects. The number of lanes can be increased with the width; depth and equipment are set in the design according to whether the pool is used for training or competition.
Çilek Havuz Corporate
A training pool requires depth and equipment according to its purpose. For diving, rescue or swimming training the size comes from the institution's specification. In a swimming pool, size and depth are chosen for the users' comfort. In a deep training pool the water pressure, waterproofing and safety calculations differ greatly from a residential pool; we draw the structural design for that load.
Çilek Havuz Corporate
Yes. Our deepest project is the 10-metre-deep diving training pool we built for the training centre of a public institution; it is the deepest training pool in Türkiye. At that depth the water pressure, waterproofing and safety calculations are very different from a villa pool. In villa and hotel projects we apply the required depth with the same calculations.
Çilek Havuz Corporate
A concrete pool can be built all year round. On frosty days concrete pouring is postponed, or the concrete is kept warm and the curing period is extended. In winter, crews and materials are easier to find than in summer. To those who want to use their pool at the start of summer, we recommend starting work in winter, taking the design and permit period into account.
Çilek Havuz Corporate
Yes, every pool project should start with a ground assessment. In projects started without soil analysis, flooding, structural cracks and uplift of the floor are common problems. During the site survey we assess the bearing capacity of the ground and the slope of the land, and we draw the structural design with this information.
Çilek Havuz Corporate
The most common mistakes are skipping the ground survey, cheap waterproofing and filtration that is too small for the pool volume. Starting without a permit, sizing the pool only for summer use and leaving the scope to verbal promises also prove costly later. We clarify each of these together during the site survey and in the written quote.
Çilek Havuz Corporate
Sand, glass and zeolite are the three common filter media; the choice depends on the clarity you expect. Quartz sand holds particles of about 20-40 microns, glass media 9-15 microns, zeolite 3-5 microns. Sand is economical but is renewed every 5-7 years; glass uses less water in backwashing, and zeolite gives the finest filtration at the highest cost.
Çilek Havuz Corporate
Glass mosaic, ceramic, natural stone (travertine, basalt, granite) and pool paint are used in concrete pools. In heavily used hotel and public pools durability comes first; in a villa pool colour and texture often lead. In prefabricated pools a liner or gelcoat surface comes from the factory. We choose the finish together according to the structure, use and budget.
Çilek Havuz Corporate
Yes; the two most common heating options are the heat pump and the solar collector. In most of Türkiye the water drops below 15 °C between October and April, and an unheated pool is not used in those months. The lines for underwater lighting are drawn into the electrical design from the start; we calculate the heating capacity according to the regional climate and how often the pool is used.
Çilek Havuz Corporate
Our warranty on construction workmanship is 2 years; for equipment such as pumps and filters the manufacturer's own warranty applies. After handover our pool maintenance service can take over: water balance, filter and equipment are checked on periodic visits, and the seasonal opening and closing are part of the service.
Çilek Havuz Corporate
Yes, it is free. When a request comes in by phone, WhatsApp or the form, one of our engineers visits on the agreed day and inspects the ground, size, water and electricity connections on site. After the survey an itemised written quote is sent within 3-5 working days on average.
Çilek Havuz Corporate
We build pools across Türkiye and abroad. Istanbul's clay soil, Antalya's limestone bedrock, the granite formation of the Aegean coast and the frost depth of Central Anatolia call for different engineering solutions; we assess the ground on site during the survey and choose the system for the region. The list of regions is on the service areas page.
Çilek Havuz Corporate
Scope, material class, warranty period and handover date should be stated clearly in a written contract. Verbal agreements do not hold in a dispute. We prepare our quote item by item in writing, and we write the concrete class, waterproofing layers, equipment list and the 2-year workmanship warranty into the contract.
Çilek Havuz Corporate
Next step
Let us discuss your project in the way that suits you best.
You can fill in the form for a written quote, schedule a video project presentation or ask us to survey your project site.
Get a Quote
Send us your dimensions and expectations in writing.
Online presentation
Video project presentation
On-site survey
Inspection at your project site
// 08 · Company & Contact
To talk about your project, call or write to us.
Legal Name
Çilek Havuz
Founded
1998 · Istanbul
Head Office
Çilek Plaza, Eyüp Sultan Mah. Yakacık Cd. Feshane Cd. No: 2 D:4 D:1, 34885 Sancaktepe / İstanbul
Service Area
All of Türkiye · exports to 14 countries
Branches
Kyrgyzstan · Egypt · Algeria · Iraq
Showroom
Plan a showroom visit
At our showroom in Çilek Plaza, Sancaktepe, you can discuss your project with our team. We recommend booking an appointment by phone before your visit.
Working Hours
- Monday – Friday · 08:00 – 17:30
- Saturday · 08:00 – 12:30
- Closed on Sunday