Reinforced concrete infinity pool on a hillside plot

Excavation and concrete

Weeks 4-5
  1. 01
  2. 02
  3. 03
  4. 04

Infinity pool construction at Çilek Havuz

We carry out infinity pool construction with a single team, from the level survey to commissioning.

We draw the architectural, structural and electrical projects and handle the permit process ourselves; the quotation is itemised line by line.

Year founded
1998
Years in the industry
33+
Export countries
14
Workmanship warranty
2

// 01 · Decision

An infinity pool starts with four questions, and the edge follows from the answers.

The infinity effect is an illusion built from a single viewpoint. We first establish the direction of the view and what the land allows, then how many edges will overflow and where the balance tank will fit.

  1. 01

    View direction and viewpoint

    The overflow edge faces the direction that hides the line where the water ends, as seen from the seating area. If the ground drops beyond the pool the effect is complete; if rising ground lies beyond, the infinity view does not form.

    • Sight line from the terrace and living room
    • Sea, lake or valley direction
    • Effect of the prevailing wind on the edge
  2. 02

    What the land and soil allow

    Most plots with a view are sloped, and the ground does not continue beneath the overflow edge. We carry out the soil survey before the architectural drawings and decide at the outset whether a retaining wall or bored piles are needed.

    • Land slope and level survey
    • Bearing capacity and groundwater
    • Need for retaining wall or deep foundation
  3. 03

    Overflow edges and tank position

    A single overflow edge is the most measured solution for a view in one direction. With corner or perimeter overflow, the weir, channel, tank and pump all grow together; we place the balance tank adjacent to the shell wherever possible.

    • Single edge, corner or perimeter overflow
    • Balance tank adjacent to the shell
    • Location of the plant room
  4. 04

    Calculating flow rate and tank volume

    A 6 mm water film over the weir needs about 3.1 m³ of water per hour for every metre of edge. The balance tank is sized on the sum of bather displacement, wave allowance and the water that returns when the pump stops.

    • Overflow edge length and water film
    • Number of simultaneous bathers
    • Filtration turnover and separate pumps

// 01 · Infinity pool models

There are six infinity pool models, chosen to suit the land.

We build six infinity pool models: single-edge overflow, corner overflow, perimeter overflow mirror pool, terrace and rooftop pool, hillside pool and hotel infinity pool. The model is chosen during the site survey according to the view and the land.

Infinity pool models
Single-edge overflow

01 / 06

Single-edge overflow

One edge facing the view overflows.

Overflow edge
Single edge
Land
Sloped land
Balance tank
Below the edge
Finish
Glass mosaic, marble weir

The edge facing the view is finished as a weir; the other edges stay skimmer or plain. The weir, channel and tank are at their shortest; this model gives the infinity effect on the most measured budget.

Best suited toVillas and holiday homes

View in detail: Single-edge overflow

One edge facing the view overflows.

Single-edge overflow
Overflow edge
Single edge
Land
Sloped land
Balance tank
Below the edge
Finish
Glass mosaic, marble weir

The edge facing the view is finished as a weir; the other edges stay skimmer or plain. The weir, channel and tank are at their shortest; this model gives the infinity effect on the most measured budget.

Best suited toVillas and holiday homes

View in detail: Single-edge overflow

// 01 · Flow rate and balance tank calculation

Enter the pool dimensions, and we calculate flow and tank size.

Enter the pool width, length and average depth, the overflow edge length and the number of simultaneous bathers; filtration flow, overflow edge flow and net balance tank volume are calculated instantly.

Width5.0 m
Length10.0 m
Average depth1.4 m
Overflow edge length10.0 m
Simultaneous bathers10 bathers

Calculation rule: filtration flow = pool volume ÷ 6 hours. Overflow edge flow follows the weir equation Q = 1.84 × L × h^1.5; for a 6 mm water film, about 3.1 m³ per hour for every metre of edge. Net balance tank volume = 0.075 m³ displacement per bather + 0.03 × water surface wave allowance + water surface × 0.006 m shutdown allowance. Bather capacity is one person per 4.5 m² of water surface. Water in channels and pipes and filter backwash water are added during the site survey.

Get a quotation for these dimensions

Send us the pool dimensions, the direction of the view and the slope of the land; we finalise the weir, balance tank and pump line during the site survey and prepare an itemised quotation.

Calculation: 10.0 × 5.0 × 1.4 m
ItemValue
Water surface50.0 m²
Pool volume70.0 m³
Filtration flow (6-hour turnover)11.7 m³/h
Overflow edge flow (6 mm water film)30.8 m³/h
Recommended maximum bathers11 bathers
Bather displacement0.75 m³
Wave allowance1.5 m³
Shutdown allowance (water above the weir)0.3 m³
Net balance tank volume2.6 m³

// 01 · Overflow edge section

The overflow edge has five layers, leaving the water on a single line.

We build the overflow edge, from the pool side to the channel, with finish, waterproofing, reinforced concrete shell, weir stone and catch channel. The waterproofing turns continuously over the weir into the channel, and the weir stone lets the water flow as a thin sheet.

Layer breakdown of an infinity pool overflow edge from the pool side to the catch channel
← PoolChannel →
  1. Pool finishGlass mosaic or porcelain; a dark tone merges with the horizon.
  2. WaterproofingTwo-coat membrane, mesh and corner tape; runs on into the channel.
  3. Concrete shellShell, weir and balance tank are poured as one structural system.
  4. Weir stoneSet 2-6 mm below the water line with a ±2 mm tolerance.
  5. Catch channelCollects the spilling water along the edge and feeds the tank.

// Reading plan

Before building an infinity pool, read these six short articles.

The order follows the natural course of an infinity pool decision: first the whole build, then flow and tank calculation, cost, the plant room, pools on buildings and choice of finish.

  1. What an infinity pool is and how it is built

    Weir, catch channel and balance tank in one article.
    7 min

    Short answer

    The weir ends 2 to 6 mm below the water line; overflowing water drops into the catch channel and is pumped back to the pool from the balance tank. If the level drifts along the weir, water runs from a single point and the effect breaks.

    1. 01Excavation and concreteWeeks 4-5Excavation, retaining walls, shell, weir and balance tank in one pour
    2. 02Waterproofing and weir levelWeeks 1-2Two-coat membrane, water retention test, laser levelling of the edge
    3. 03Finishes and plumbingWeeks 2-4Glass mosaic, weir stone, pump, filter and level control
    4. 04CommissioningWeeks 1Flow test, lighting scenes and user training
  2. Skimmer pool or overflow pool

    The difference between the two and balance tank volume.
    7 min

    Short answer

    In an overflow pool the water is level with the coping and the surface is skimmed continuously. The balance tank is sized on bather displacement, wave and shutdown allowances; with channel and pipe volume it reaches about 3-4 m³ for a 50 m² pool.

  3. Infinity pool cost

    Which items are added compared with a standard pool.
    11 min

    Short answer

    A balance tank, weir workmanship, a second pump line and level automation are added to a skimmer pool of the same size. On sloped land, a retaining wall or bored piles is the most variable item.

  4. Pool plumbing and plant room

    Sizing the pump, filter and pipe diameter.
    9 min

    Short answer

    In a residential pool all the water passes through the filter every 6 hours; a 75 m³ pool needs 12-13 m³ per hour. In an overflow system suction is taken from the balance tank, and the plant room grows with the tank.

  5. Building pools on terraces and roofs

    Load and waterproofing for an infinity pool on a building.
    6 min

    Short answer

    One cubic metre of water weighs about one tonne; a terrace pool is calculated for its static weight and its dynamic behaviour under earthquake. Waterproofing and the plant room are resolved together with the building design.

  6. Pool finish options

    Ceramic, glass mosaic and how colour affects the water.
    5 min

    Short answer

    Light tones give clear turquoise water, dark tones a deeper and calmer look. In an infinity pool, dark glass mosaic makes the surface read as one with the horizon.

Showroom

Plan a showroom visit

At our showroom in Çilek Plaza, Sancaktepe, you can discuss your project with our team. We recommend booking an appointment by phone before your visit.

Working Hours

  • Monday to Friday · 08:00-17:30
  • Saturday · 08:00-12:30
  • Closed on Sunday
Directions

// 02 · Cost

What sets infinity pool cost, is the edge and the land.

In infinity pool construction, the budget depends as much on the length of the overflow edge, the balance tank and the structural needs of the land as on the pool size. The six factors below explain the difference between infinity pool prices; the exact figure is set by an itemised quotation after the site survey.

  • Number of overflow edges

    A longer edge enlarges the weir, channel, tank and pump together.

  • Balance tank

    A separate concrete chamber; it shrinks if cast against the shell.

  • Land and structure

    Sloped land may need a retaining wall or bored piles.

  • Weir workmanship

    Laser formwork and level touch-ups add labour per edge metre.

  • Finish class

    Glass mosaic, natural stone and weir stone machined to size.

  • Mechanical and automation

    Second pump line, level control and automatic top-up.

Reinforced concrete infinity pool on a hillside plot

// 03 · Process

An infinity pool is built in twelve steps, each resting on the one before.

The process starts with the level survey and hydraulic calculation, continues with excavation and reinforced concrete, and takes shape with waterproofing and millimetre-precise edge work. We hand over the pool with a flow test, lighting and user training.

  1. Survey and design

    Level survey, overflow design, balance tank and hydraulic calculation

    Approved design and itemised quotation

  2. Structure

    Excavation, retaining walls, concrete shell, weir and balance tank

    Shell and balance tank in one pour

  3. Waterproofing and edge

    Two-coat waterproofing, retention test, laser levelling and finish

    Level-approved, finished pool

  4. Handover

    Plumbing, lighting, automation, flow test and training

    Commissioned infinity pool

The twelve steps in detail

Preliminary Survey & Level Study · 01/12

01 / 12

Preliminary Survey & Level Study

Sightline and Slope Analysis

The success of an infinity pool depends on reading the terrain correctly from the very first day. The Çilek Havuz technical team measures the slope of the land, the sightline of the view, the viewing angles and the ground conditions on site, and determines the layout at which the infinity effect will be strongest.

At this stage we clarify which edge or edges will overflow, how the overflow edge relates to the direction of view, the position of the balance tank and the location of the plant room. The level study forms the basis of the millimetric edge work to come.

  • Site slope and level survey
  • Sightline and viewing angle
  • Choice of overflow edge orientation
  • Ground bearing capacity
  • Balance tank position
  • Plant-room layout
  • Preliminary zoning and permit check
  • Preliminary budget frame

Why it matters

The infinity effect is an illusion, and it is built entirely on the viewing angle. An overflow edge facing the wrong way cannot deliver the intended effect even with the most expensive craftsmanship, which is why the survey is the most critical step of an infinity project.

// 04 · Finish materials

We choose separate materials for pool and weir, because water flows over the weir.

We use glass mosaic and porcelain inside the pool, marble or granite machined to size on the weir, and travertine and basalt for the surrounding paving. Dark tones make the pool surface read as one with the horizon; grout colour is chosen for the underwater appearance.

  • Glass mosaic · It does not absorb water and resists chemicals; the surface stays bright for many years. In navy01

    Glass mosaic

    It does not absorb water and resists chemicals; the surface stays bright for many years. In navy, anthracite and dark green it gives the strongest horizon-blending effect.

    Used on

    • Pool interior
    • Weir outer face
  • Porcelain tile · Its low water absorption makes it resistant to frost and chemicals02

    Porcelain tile

    Its low water absorption makes it resistant to frost and chemicals. In hotel and residence pools it withstands constant cleaning and heavy use.

    Used on

    • Pool interior
    • Channel
    • Surrounding paving
  • Marble weir stone03

    Marble weir stone

    The weir stone arrives on site machined to size in the workshop; it produces less waste than on-site cutting and holds a more even level. Chamfer and drip details are machined with the stone.

    Used on

    • Weir
    • Edge
  • Granite · A hard, wear-resistant stone04

    Granite

    A hard, wear-resistant stone; we choose it as weir and coping stone on heavily used hotel edges and perimeter overflow pools.

    Used on

    • Weir
    • Edge
    • Surrounding paving
  • Travertine · Its warm tone ties the pool surround to the landscape05

    Travertine

    Its warm tone ties the pool surround to the landscape. It is laid with filled pores and a honed surface, giving a non-slip finish in wet areas.

    Used on

    • Surrounding paving
    • Edge
  • Basalt · A dark, dense volcanic stone06

    Basalt

    A dark, dense volcanic stone. On hillside pools it continues the tone of the dark water surface on the outer face of the overflow edge and in the paving.

    Used on

    • Surrounding paving
    • Weir outer face

// 04 · Infinity pool materials

From pumps to lighting, we choose equipment for overflow systems.

Pool pumps, filters, automation and dosing units, valves and lighting are among our products. You can review the flow rate, dimensions and connection type of each product on its own page.

// 05 · Projects

From villas to hillside plots, the overflow pools we have built.

We gather our infinity and overflow pool projects here. In each project, the direction of the overflow edge, the balance tank and the pump flow were calculated separately for the land.

// 05 · Service regions

Across Türkiye and abroad, we build infinity pools.

We carry out infinity pool construction across Türkiye in villa, residence and hotel projects; we export to 14 countries and run projects abroad on site through our branches in Kyrgyzstan, Egypt, Algeria and Iraq.

Türkiye

15
  • Istanbul
  • Mugla / Bodrum
  • Antalya
  • Izmir / Cesme
  • Ankara
  • Bursa
  • Kocaeli / İzmit
  • Adana
  • Mersin
  • Tekirdağ
  • Kandıra
  • Sakarya
  • Samsun
  • Denizli
  • Elazığ

Abroad

13
All service regions

// 06 · After handover

Handover is not the end, we continue maintenance together.

At handover we run the flow test together and explain pump speed, level control and lighting scenes on site. Our workmanship carries a 2-year warranty.

  1. 012 years

    Warranty

    Our construction workmanship is guaranteed for 2 years from handover; warranty documents are provided at handover.

  2. 023-5 days

    Commissioning and training

    We check the flow along the edge one last time, set pump speed and level control, and explain the automation on site.

  3. 03Weekly

    Water balance and weir

    Water balance is measured and the filter checked; the weir surface is monitored for scale and algae, and the edge flow is inspected visually.

  4. 04Start of season

    Balance tank

    The tank is drained and cleaned of sediment and biofilm; the level float and automatic top-up are tested on the same visit.

Prepared byAli SAVAŞ · Project Manager · Mechatronics Engineer

// 07 · Questions

About infinity pool construction, frequently asked questions.

Çilek Havuz Corporate

Pool & Wellness Engineering

Response Time
Same day
Channels
Phone · Email · WhatsApp

If the answer you are looking for is not here, send your question directly to us and our team will reply as soon as possible.

+90 216 475 39 37

The work proceeds in four stages: survey and design, structure, waterproofing and edge, and handover; retaining and piling work on sloped land can extend the schedule, which is given in writing after the site survey.

Çilek Havuz Corporate

The overflow edge is a weir ending 2 to 6 mm below the water line. Water flows over the weir as a thin sheet into the catch channel, runs from there to the balance tank and is pumped back to the pool through the filter.

Çilek Havuz Corporate

The weir is levelled along its full length with a laser level to a ±2 mm tolerance. A section left a few millimetres low draws the water towards it and the sheet breaks on neighbouring sections; the level is checked a second time after finishing.

Çilek Havuz Corporate

Net balance tank volume is the sum of three components. They are 0.075 m³ bather displacement per person, a wave allowance of 0.03 times the water surface, and the water that returns over the weir when the pump stops. With water in channels and pipes added, it reaches about 3-4 m³ for a 50 m² pool.

Çilek Havuz Corporate

Flow is calculated from the length of the overflow edge and the water film over the weir. A 6 mm water film needs about 3.1 m³ per hour for every metre of edge; a 10 metre edge needs about 31 m³ per hour. This flow is calculated separately from the filtration flow.

Çilek Havuz Corporate

Cost depends on pool size and the number and length of overflow edges. The location of the balance tank, the structural needs of the land, the finish class and automation also affect it. On sloped land, a retaining wall or bored piles is the most variable item.

Çilek Havuz Corporate

On flat land the eye level stays the same as the pool, so the edge of the catch channel enters the line of sight and the infinity effect weakens. On flat ground, a perimeter overflow mirror pool or a raised overflow edge gives a better result.

Çilek Havuz Corporate

If the view is in one direction, a single overflow edge is the most measured solution. With corner or perimeter overflow, the weir, channel, balance tank and pump flow all grow together; finishing the other edges with skimmers reduces the budget without spoiling the view.

Çilek Havuz Corporate

Yes, but slab capacity, seismic behaviour and waterproofing are calculated together with the building's structural design. One cubic metre of water weighs about one tonne. The balance tank and plant room are planned inside the building from the start.

Çilek Havuz Corporate

The pump stops and the overflow pauses; the water above the weir drains to the balance tank and no flooding occurs. Because the tank is sized for this shutdown allowance, the system resumes circulation when power returns.

Çilek Havuz Corporate

Retrofitting is technically possible, but the key elements need to be designed in from the start. The overflow edge, catch channel and balance tank belong in the structure and the site levels. Adding them to an existing shell is a major structural intervention; we assess suitability on site during the survey.

Çilek Havuz Corporate

Navy, anthracite or dark green glass mosaic gives the strongest horizon-blending effect. We use marble or granite machined to size on the weir and travertine or basalt for the surrounding paving; grout colour is chosen for the underwater appearance.

Çilek Havuz Corporate

Maintenance consists of monitoring water balance and checking the filter. The weir surface is watched for scale and algae, and the balance tank is cleaned periodically. Because the surface overflows continuously, the water stays cleaner than in a skimmer pool.

Çilek Havuz Corporate

Çilek Havuz carries out infinity pool construction across Türkiye in villa, residence and hotel projects. It exports to 14 countries, and we run projects abroad through our branches in Kyrgyzstan, Egypt, Algeria and Iraq.

Çilek Havuz Corporate

Next step

Let us discuss your project in the way that suits you best.

You can fill in the form for a written quote, schedule a video project presentation or ask us to survey your project site.

  • Get a Quote

    Send us your dimensions and expectations in writing.

  • Online presentation

    Video project presentation

  • On-site survey

    Inspection at your project site

// 08 · Company & Contact

To talk about your project, call or write to us.

Legal Name

Çilek Havuz

Founded

1998 · Istanbul

Head Office

Çilek Plaza, Eyüp Sultan Mah. Yakacık Cd. Feshane Cd. No: 2 D:4 D:1, 34885 Sancaktepe / İstanbul

Service Area

All of Türkiye · exports to 14 countries

Branches

Kyrgyzstan · Egypt · Algeria · Iraq

Showroom

Plan a showroom visit

At our showroom in Çilek Plaza, Sancaktepe, you can discuss your project with our team. We recommend booking an appointment by phone before your visit.

Working Hours

  • Monday – Friday · 08:00 – 17:30
  • Saturday · 08:00 – 12:30
  • Closed on Sunday
Directions