
Pool consultancy process
01 / 04
Survey and analysis
Week 1- 01
- 02
- 03
- 04
Pool consultancy at Çilek Havuz
We provide pool consultancy with the same engineering criteria we use on our own sites.
One team runs the survey, the design review, the specification and the site supervision, and every step ends with a written document.
- Year founded
- 1998
- Years of industry experience
- 33+
- Export countries
- 14
- Workmanship warranty
- 2
// 01 · Decision
A pool decision starts with four questions, and the design follows from the answers.
The most expensive mistake in a pool is cast in concrete. That is why we clarify the use, the land, the design file and the scope of the bids together before an excavator enters the site.

01
Pool users and frequency of use
A villa pool is used by a few people, a residential or hotel pool by hundreds throughout the day. Bather load sets the turnover time, and turnover time sets the pump, filter and pipe sizes.
- Private, residential complex or hotel scenario
- Maximum bather load by depth
- Swimming, cooling off or training
02
What the land and zoning allow
Soil bearing capacity, groundwater level and plot setbacks must be known before excavation. On ground with groundwater, drainage and uplift calculations change the shell directly.
- Soil investigation and groundwater
- Setbacks and building footprint
- Plant room and site access
03
Completeness of the design file
Every cubic metre of water weighs roughly one tonne; a structural design that carries this load and a hydraulic calculation that circulates the water must stand behind the rendering. We report missing drawings in a written list.
- Architectural, structural and reinforced concrete drawings
- Mechanical and electrical designs
- Balance tank and plant room layout
04
Comparable scope across bids
The gap between two bids usually comes from scope, not price. Shell, waterproofing, finish, circulation, pump flow rate, filter diameter, pipe diameter and heating must be written into every bid.
- A written answer for eight technical lines
- Table of included and excluded items
- Payment plan tied to milestones
// 01 · Consultancy scopes
There are six consultancy scopes, chosen by the stage of the project.
We provide pool consultancy in six scopes: survey and feasibility, design review and second opinion, specification and contractor selection, site supervision, condition assessment of existing pools, and hotel and facility pool consultancy. The scope is set in the first meeting according to the stage the project has reached.

01 / 06
Survey and feasibility
Reading the site and the budget before the pool.
- Stage
- Pre-design
- Working method
- On-site survey
- Duration
- 2-4 day survey
- Deliverable
- Survey and feasibility report
We inspect the slope, the soil, the distance to water and power supply and the plant room area on site. We break the budget into items and set the operating cost next to the construction price.
Suitable forVilla, residential complex and hotel
View details: Survey and feasibilityReading the site and the budget before the pool.

- Stage
- Pre-design
- Working method
- On-site survey
- Duration
- 2-4 day survey
- Deliverable
- Survey and feasibility report
We inspect the slope, the soil, the distance to water and power supply and the plant room area on site. We break the budget into items and set the operating cost next to the construction price.
Suitable forVilla, residential complex and hotel
View details: Survey and feasibility
01 / 06Survey and feasibility
- Stage
- Pre-design
- Working method
- On-site survey
- Duration
- 2-4 day survey
- Deliverable
- Survey and feasibility report
We inspect the slope, the soil, the distance to water and power supply and the plant room area on site. We break the budget into items and set the operating cost next to the construction price.
Suitable forVilla, residential complex and hotel
View details: Survey and feasibilityDesign review and second opinion
- Stage
- Design stage
- Working method
- Document-based
- Duration
- 1-2 weeks
- Deliverable
- Written design opinion
We check that structural and hydraulic calculations exist, along with the waterproofing detail, equipment sizing and balance tank layout. We set out gaps and risks in a written report before you sign.
Suitable forInvestors with a completed design
View details: Design review and second opinionSpecification and contractor selection
- Stage
- Tender stage
- Working method
- Documents and meetings
- Duration
- 1-2 weeks
- Deliverable
- Technical specification and comparison table
We write every work item, from concrete class to pump flow rate, into a criteria list. We collect bids against the same specification, compare them in a levelled table and attach a work schedule and payment plan to the contract.
Suitable forProjects collecting several bids
View details: Specification and contractor selectionIndependent site supervision
- Stage
- Construction stage
- Working method
- Scheduled site visits
- Duration
- Throughout construction
- Deliverable
- Photographic inspection reports
We inspect work that disappears once finished, such as reinforcement, waterproofing and embedded pipes, before it is covered. We have a water tightness test carried out before the finish and record every visit in a photographic report.
Suitable forPools built by another contractor
View details: Independent site supervisionCondition assessment of existing pools
- Stage
- Construction or operation
- Working method
- On-site assessment
- Duration
- 1-2 weeks
- Deliverable
- Condition assessment report
We compare the design, the contract and the work done to date. We set up tests for covered work and an inspection plan for the rest, and for pools that need renovation we put the repair scope in writing.
Suitable forTroubled sites and older pools
View details: Condition assessment of existing poolsHotel and facility pool consultancy
- Stage
- Design and operation
- Working method
- On site and document-based
- Duration
- Throughout the project
- Deliverable
- Capacity calculation and operating plan
We size filtration not only by volume but together with maximum bather load by depth. Dosing, sampling points, record keeping and operating staff are planned from the start in line with health regulations.
Suitable forHotel, residential and public pools
View details: Hotel and facility pool consultancy// 01 · Capacity calculation
Enter the pool dimensions, and we calculate the filtration.
Select the width, length and average depth of the pool, the type of use and the circulation system; the calculation instantly gives the water volume, target turnover time, filtration flow rate, minimum filter area, balance tank and design file.
Calculation rule: volume = width × length × average depth. For private pools, turnover time is 6 hours and sand filter velocity is at most 50 m/h. For residential complexes and hotels, maximum bather load is water surface ÷ 2.2 m² (depth below 1.0 m), ÷ 2.7 m² (1.0-1.5 m), ÷ 4.0 m² (above 1.5 m); turnover time in the same order is 1.25, 2 and 2.5 hours; flow rate is the greater of volume ÷ turnover time and bather load × 1.7 m³/h, with filter velocity at most 25 m/h. Balance tank is 60-80 litres per m² of water surface; a private pool with a skimmer system needs a plant room of 4-6 m². Final values are set in the hydraulic design.
Get an opinion on these dimensions
Send us the pool dimensions, the intended use and your current design; we will review capacity, missing drawings and bid scope, and prepare a written consultancy proposal.
| Item | Value |
|---|---|
| Water volume | 75.0 m³ |
| Water surface | 50.0 m² |
| Maximum bather load | Calculated in the design |
| Target turnover time | 6 hours |
| Filtration flow rate | 12.5 m³/h |
| Sand filter area (minimum) | 0.25 m² |
| Equivalent single filter diameter | 0.56 m |
| Balance tank volume | Not required |
| Plant room area | 4-6 m² |
| Design file | Architectural, structural, reinforced concrete, mechanical, electrical, soil investigation |
// Reading plan
Before you build a pool, read these six short articles.
The order follows the natural flow of a pool decision: permit and design first, then plumbing, bid comparison, contractor selection, the contract and operating costs.
Pool permits and approvals
Which designs are required and how many weeks it takes.9 minShort answer
Fixed reinforced concrete pools usually require a permit; the file includes architectural, structural, reinforced concrete and building services designs and a soil investigation. From zoning status to approval, a range of 1.5 to 3 months is realistic.
- 01Survey and analysisWeek 1Report on land, soil, utilities and intended use
- 02Design and feasibilityWeek 2-4Structural, hydraulic and itemised budget review
- 03Specification and supervisionWeek 1-2Criteria list, levelled bid table, site reports
- 04CommissioningWeek 1-2Attendance at tests, handover file and operating plan
Pool plumbing and plant room
Pump, filter, pipe diameter and room area.9 minShort answer
In a private pool, the full water volume should pass through the filter every 6 hours; for a 75 m³ pool this means a flow rate of 12-13 m³/h. For a private pool with a skimmer system, a plant room of 4-6 m² is sufficient.
Why pool quotes differ
The choices that separate two quotes for the same size.9 minShort answer
The gap usually comes from excavation and soil, the waterproofing system, the finish and the circulation choice. Quotes can only be compared when they price the same scope at the same quality class.
How to choose a pool contractor
Eight lines that must be written into the quote.8 minShort answer
Shell and reinforcement, waterproofing, finish, circulation, pump flow rate, filter diameter, pipe diameter and heating capacity must be written into the quote. See references on site, not in photos, and preferably in a pool more than two years old.
Pool construction contract
Ten clauses to check before signing.8 minShort answer
The scope is written item by item, equipment brand and model go into the contract, and excluded items are listed separately. Every payment is tied to measurable evidence such as a water tightness test.
Annual operating cost of a pool
Energy, water, chemicals and maintenance.7 minShort answer
Annual cost has four items: energy, water, chemicals and maintenance. A 1.1 kW pump running 8 hours a day uses about 264 kWh a month; a variable speed pump and a pool cover reduce this item permanently.
Showroom
Plan a showroom visit
At our showroom in Çilek Plaza, Sancaktepe, you can discuss your project with our team. We recommend booking an appointment by phone before your visit.
Working Hours
- Monday to Friday · 08:00-17:30
- Saturday · 08:00-12:30
- Closed on Sunday
// 02 · Cost
We price consultancy by scope, and by the scale of the project.
The pool consultancy fee is not a fixed tariff; it is set by the scale of the project and the scope you take. A design review alone and full consultancy from survey to the first season are not the same budget; the six factors below explain the difference, and scope and fee are presented in writing, item by item, after the first meeting.
Project scale
A villa pool and a hotel or public pool carry different design loads.
Consultancy scope
Second opinion, specification and supervision, separately or together.
Stage of involvement
A pre-design opinion takes less work than a post-finish assessment.
Number of site visits
Visits are scheduled around the work that will be covered.
System complexity
Overflow, infinity and roof pools add hydraulic and structural work.
Use and location
Public use adds a regulatory file, a remote site adds travel planning.
Further reading
- Why Do Pool Quotes Differ So Much? The Choices That Change Your Budget
- 2026 Pool Construction Cost: Per m² and Itemized Budget
- Pool Running Costs: How to Calculate the Annual Figure Item by Item
- Pool Investment for Hotels and Investors: 7 Questions to Ask Before You Decide
// 03 · Process
Consultancy moves in six steps, and each step delivers a written document.
The process starts with a survey and needs analysis, continues with a preliminary design opinion and feasibility, and moves into construction through the specification and site supervision. We close the consultancy with commissioning tests and a first season review.
Survey and design opinion
Site survey, needs analysis, structural and hydraulic check
Written survey report and preliminary design opinion
Feasibility and specification
Itemised budget, operating cost, technical specification, bid comparison
Feasibility opinion and levelled bid table
Construction supervision
Reinforcement, waterproofing and embedded pipe checks, water tightness test
Photographic inspection and deviation reports
Commissioning
Circulation and automation tests, handover file, training
Closed handover file and operating plan
The six steps in detail

01 / 06
Site Survey and Needs Analysis
Reading the Site Before the Pool
In consulting, our first task is not to open a catalogue but to read the site and the intention: who will use the pool and how often; is it a villa garden, a residential complex's shared area or a hotel; is the priority swimming or cooling off. Two different pools that could be drawn in the same garden mean two different operating loads; asking the right questions at the outset means eliminating the wrong pool at the outset.
At the on-site survey the fall of the land, the impression the ground gives, the distance to the water and electrical infrastructure and the area that can be given over to a plant room are all noted; the zoning and permit position is put through a preliminary check. What we produce is not a brochure but a written survey report, the reference for every decision that follows.
- Intended use and user profile
- Site fall and ground observation
- Distance to the water and electrical infrastructure
- Identifying an area for the plant room
- Preliminary assessment of pool type
- Preliminary zoning and permit check
- Site access and logistics
- Written survey report
Excavation without a design is expensive haste
The picture we meet most often on site is an excavator that has entered the garden with no design in place: the plant room forgotten, the levels wrong, the spoil moved twice. The few days given to the survey and the report wipe out that entire bill.
// 04 · Pool equipment
From pump to filter, we select equipment by a criteria list.
In the specification we define equipment not by a brand list but by flow rate, energy consumption, spare parts and service network in Türkiye. You can review the technical values of pumps, sand and cartridge filters, valves, automation and dosing products on their own pages.
// 05 · Projects
From training pools to hotels, pools we have engineered.
The criteria we use in consultancy come from projects we have built ourselves. From a 3,600 m³ training pool reaching 10 m in depth to hotel and residence pools, capacity, structure and plumbing were calculated separately for every project.
// 05 · Service regions
Across Türkiye and abroad, we provide pool consultancy.
We provide pool consultancy across Türkiye for villa, residential, hotel and public projects; design review and specification run remotely on documents, while surveys and supervision are carried out through scheduled site visits. We export to 14 countries and follow projects abroad on site through our branches in Kyrgyzstan, Egypt, Algeria and Iraq.
Türkiye
15- Istanbul
- Mugla / Bodrum
- Antalya
- Izmir / Cesme
- Ankara
- Bursa
- Kocaeli / İzmit
- Adana
- Mersin
- Tekirdağ
- Kandıra
- Sakarya
- Samsun
- Denizli
- Elazığ
Abroad
13- AlgeriaBranch
- EgyptBranch
- IraqBranch
- KyrgyzstanBranch
- France
- Germany
- Kazakhstan
- Libya
- Qatar
- Russia
- Saudi Arabia
- United Arab Emirates
- United Kingdom
// 06 · After handover
Handover does not end when the pool is filled, we see the first season through together.
At commissioning we check circulation, filter pressure, automation and water balance together. We do not recommend final approval until the design and warranty file is in your hands, and in the first season we fine-tune settings together based on real usage data.
- 01Full set
Handover file
Structural and hydraulic designs, equipment warranty documents and the maintenance manual are handed over in full.
- 021 season
First season follow-up
We adjust the pump schedule, dosing and winterisation plan together based on the pool's real usage data.
- 032 roles
Operating staff
Public pools must employ a technically responsible pool water operator and a certified lifeguard.
- 04Once a year
General cleaning
The water of a public pool is drained at least once a year for general cleaning; we write the schedule into the operating plan.
Related services
- Swimming Pool ConstructionReinforced-concrete, prefabricated and infinity swimming pools, built turnkey for villa, residential and commercial projects.
- Infinity PoolsPools that open onto the view, with water spilling over the edge into a balance tank.
- Aquapark ConstructionWater parks with slides for hotels, holiday resorts and municipalities.
- Pool MaintenanceWater chemistry, equipment and periodic maintenance.
- Landscape ArchitectureLandscape design that unites the pool with its garden and surroundings.
- Spa & Wellness ConsultingEnd-to-end design consulting for wellness spaces.
Prepared byAli SAVAŞ · Project Manager · Mechatronics Engineer
// 07 · Questions
About pool consultancy, frequently asked questions.
Çilek Havuz Corporate
Pool & Wellness Engineering
- Response Time
- Same day
- Channels
- Phone · Email · WhatsApp
If the answer you are looking for is not here, send your question directly to us and our team will reply as soon as possible.
+90 216 475 39 37The fee depends on the scale of the project, the breadth of the scope you take and the stage at which we join. A design review alone and full consultancy from survey to the first season are not the same budget; we present scope and fee in writing, item by item, after the first meeting.
Çilek Havuz Corporate
Yes, consultancy can be taken independently of construction. You can take the survey, preliminary design opinion, feasibility and specification from us and carry out construction with any contractor you choose; if you wish, we also take on site supervision.
Çilek Havuz Corporate
Yes, a second opinion on existing designs and bids is one of our most frequent requests. We review whether structural and hydraulic calculations exist, the waterproofing detail, equipment sizing and bid scope, and report gaps in writing.
Çilek Havuz Corporate
Yes, you can award the construction to any contractor you choose. Our job is to write the specification, make bids comparable on the same scope and supervise that your chosen contractor builds in line with the design; the decision is always yours.
Çilek Havuz Corporate
The ideal moment is before excavation starts and before the design is finalised. The pool's location, type and plant room can be corrected at almost no cost at this stage. We can also join while bids are being collected, during construction or after a problem has arisen.
Çilek Havuz Corporate
Our equipment recommendations come not as a brand list but as a written specification. It covers flow rate, energy consumption, spare parts and service network in Türkiye. Any brand that meets the specification can bid, and the choice is made on a criteria table.
Çilek Havuz Corporate
Yes, we join ongoing sites with a condition assessment. We compare the design, the contract and the work done to date, set up tests for covered work and an inspection plan for the rest, and state clearly what we cannot verify retrospectively.
Çilek Havuz Corporate
Yes, design and bid review, feasibility and specification run remotely on documents, and meetings are held online. Surveys and site supervision are carried out through scheduled visits timed to the critical moments of construction, and every visit is documented in a photographic report.
Çilek Havuz Corporate
For private pools we aim for the full water volume to pass through the filter every 6 hours. In residential, hotel and public pools the time is shorter and depends on depth; 2.5 hours applies above 1.5 m and 2 hours between 1.0 and 1.5 m.
Çilek Havuz Corporate
First the maximum bather load is found by depth: one person per 2.2 m² of water surface below 1.0 m, 2.7 m² between 1.0 and 1.5 m, and 4.0 m² deeper. The flow rate is the greater of volume divided by turnover time and 1.7 m³/h per person; in a sand filter the velocity should not exceed 25 m/h.
Çilek Havuz Corporate
The file usually includes the title deed and zoning status, setting-out plan, and architectural and structural designs. Reinforced concrete drawings, electrical and mechanical designs and a soil investigation are also part of it. We draw the architectural, structural and electrical designs and manage the permit process.
Çilek Havuz Corporate
For a private pool with a skimmer system, 4-6 m² is sufficient, and clear height should not fall below 1.80 m. In an overflow system the area grows because a balance tank of 60-80 litres per m² of water surface is added.
Çilek Havuz Corporate
The documents depend on the scope you take. They include a survey report, preliminary design opinion, feasibility opinion, technical specification, levelled bid table, photographic inspection reports and a handover file checklist. We deliver a written document at the end of every step.
Çilek Havuz Corporate
Çilek Havuz provides pool consultancy across Türkiye for villa, residential, hotel and public projects. It exports to 14 countries, and we run projects abroad through our branches in Kyrgyzstan, Egypt, Algeria and Iraq.
Çilek Havuz Corporate
// Sources and regulations
Sources and regulations
The official documents behind the technical framework on this page; links open the institutions' own sites.
- Regulation on the Health Principles and Conditions for Swimming Pools (Official Gazette No. 27866, 6 March 2011)Official Gazette of Türkiye
- Regulation Amending the Swimming Pools Regulation (Official Gazette, 15 December 2011)Official Gazette of Türkiye
- Guidelines for safe recreational water environments, Volume 2: Swimming pools and similar environments
Next step
Let us discuss your project in the way that suits you best.
You can fill in the form for a written quote, schedule a video project presentation or ask us to survey your project site.
Get a Quote
Send us your dimensions and expectations in writing.
Online presentation
Video project presentation
On-site survey
Inspection at your project site
// 08 · Company & Contact
To talk about your project, call or write to us.
Legal Name
Çilek Havuz
Founded
1998 · Istanbul
Head Office
Çilek Plaza, Eyüp Sultan Mah. Yakacık Cd. Feshane Cd. No: 2 D:4 D:1, 34885 Sancaktepe / İstanbul
Service Area
All of Türkiye · exports to 14 countries
Branches
Kyrgyzstan · Egypt · Algeria · Iraq
Showroom
Plan a showroom visit
At our showroom in Çilek Plaza, Sancaktepe, you can discuss your project with our team. We recommend booking an appointment by phone before your visit.
Working Hours
- Monday – Friday · 08:00 – 17:30
- Saturday · 08:00 – 12:30
- Closed on Sunday















