Aquapark construction

In water park construction, we size by capacity first, and choose the slides afterwards.

Get a Quote
Aquapark in a hotel garden

Ground and reinforced concrete

Weeks Depends on scale
  1. 01
  2. 02
  3. 03
  4. 04

Çilek Havuz in aquapark construction

We build aquaparks with the same engineering discipline we apply to pools.

One team handles the survey, master plan, hydraulic design, construction and commissioning, and every quotation is itemised line by line.

Year founded
1998
Years in the industry
33+
Export countries
14
Workmanship warranty
2

// 01 · Decision

An aquapark decision starts with four questions, the attraction list comes last.

The success of an aquapark is decided not in the choice of slides but in the decisions on ground, capacity and flow. We first clarify who will use the park and how intensively, then what the site and infrastructure allow.

  1. 01

    Audience and intensity of use

    A park serving hotel guests and a park selling day tickets are not sized the same way. The target visitor profile, season length and peak day determine the water surface and the number of attractions.

    • Hotel guests or day visitors
    • Season length and peak day
    • Mix of children, families and adults
  2. 02

    What the site and infrastructure allow

    Slide towers impose point loads on the ground, while pool shells and balance tanks spread over a wide area. We make no layout decision without a soil survey, and we measure water, power and plant room capacity during the same site visit.

    • Soil bearing capacity and groundwater
    • Site slope and levels
    • Water mains and electrical supply
  3. 03

    Attractions and their zones

    Children's, family and high-thrill zones are separated by age group, and wet and dry circulation routes are drawn so they never cross. A balanced mix offering a level of thrill in every zone keeps more guests coming back than the tallest tower.

    • Body, family raft and speed slides
    • Wave pool and lazy river
    • Zero-depth children's play area
  4. 04

    Calculating capacity and flow

    In water shallower than one metre, 2.2 m² of water surface is allowed per bather, and 2.7 m² at 1.0-1.5 m depth. Filtration flow follows from water volume and turnover time, while slide flow follows from each slide's own supply requirement.

    • Instantaneous bather numbers by depth
    • Turnover time by zone
    • Supply flow per slide

// 01 · Aquapark attractions

There are six attraction types, and we choose them by capacity.

We build six types of attraction in an aquapark: body slides, family raft slides, speed and funnel slides, children's water play structures, wave pools and lazy rivers. The mix is selected on site according to the visitor profile and the capacity plan.

Aquapark attractions
Body slide · Open flume or enclosed tube, ridden on the body

01 / 06

Body slide

Open flume or enclosed tube, ridden on the body.

Use
Single rider, on the body
Water supply
Continuous flow
Age group
Children and adults, with height limit
Material
GRP modules, steel tower

Riders slide without a mat or raft; an open flume opens up the view, while an enclosed tube brings darkness and light effects to the fore. A body slide carries about 180 riders per hour and is fed continuously with around 120 m³/h of water.

Best suited toHotels, holiday resorts and water parks

Read the details: Body slide

Open flume or enclosed tube, ridden on the body.

Body slide · Open flume or enclosed tube, ridden on the body
Use
Single rider, on the body
Water supply
Continuous flow
Age group
Children and adults, with height limit
Material
GRP modules, steel tower

Riders slide without a mat or raft; an open flume opens up the view, while an enclosed tube brings darkness and light effects to the fore. A body slide carries about 180 riders per hour and is fed continuously with around 120 m³/h of water.

Best suited toHotels, holiday resorts and water parks

Read the details: Body slide

// 01 · Capacity and flow calculation

Enter the water surface and slides, and we calculate capacity and flow.

Enter the shallow and deep water surfaces, their average depths and the number of slides; the calculation instantly gives the water volume, instantaneous bather capacity, filtration flow and slide supply flow.

Shallow area (below 1.0 m)400 m²
Average depth of shallow area0.60 m
Deep area (1.0-1.5 m)300 m²
Average depth of deep area1.30 m
Body slide4 pcs
Family raft slide1 pcs

Calculation rule: instantaneous bathers = shallow area ÷ 2.2 + deep area ÷ 2.7 (per m²). Turnover time is taken as 45 min in water below 0.5 m, 75 min at 0.5-1.0 m and 2 hours at 1.0-1.5 m; filtration flow = zone volume ÷ turnover time. A body slide is taken as 120 m³/h and 180 riders per hour, a four-person family raft slide as 400 m³/h and 720 riders per hour. The exact value is set by the data sheet of the selected slide model and the hydraulic design.

Request a quotation with these values

Send us the site dimensions, visitor profile and the attractions you want; we will confirm capacity, flow and layout on site and prepare an itemised quotation.

Calculation: 700 m² · 5 pcs
ItemValue
Total water surface700 m²
Total water volume630 m³
Maximum instantaneous bathers292 people
Shallow area turnover time75 min
Deep area turnover time2 hours
Filtration flow (minimum)387 m³/h
Slide supply flow880 m³/h
Slide hourly capacity1,440 people/hour
Total pump flow1,267 m³/h

// 01 · Pool shell

An aquapark pool has five layers, carrying water and load together.

We build splash pools, wave pools and lazy rivers from the inside out with a slip-resistant finish, flexible waterproofing, a watertight reinforced concrete shell, blinding concrete and compacted ground. Every shell passes a water retention test before finishing begins.

Inside-to-outside layer section of an aquapark pool shell
← InsideOutside →
  1. Slip-resistant finishMatt ceramic or slip-resistant mosaic; grips under wet feet.
  2. Flexible waterproofingCement-based flexible layer; separates the shell from water.
  3. Reinforced concrete shellAt least C30/37, double rebar layer, 40 mm concrete cover.
  4. Blinding and drainageGives the shell a level base and drains groundwater away.
  5. Compacted groundImproved as the survey requires; prevents settlement.

// Reading plan

Before you commission an aquapark, read these six short articles.

The order follows the natural course of an aquapark decision: first heavy-use engineering, then the plant room, child safety, water regulations, operating costs and the investment decision.

  1. Hotel and commercial pools

    Filtration and turnover time under heavy use.
    7 min

    Short answer

    A commercial pool is not a large home pool; it is sized for the busiest day. Filtration flow follows from volume and turnover time, and turnover time shortens as bather density rises.

    1. 01Ground and reinforced concreteWeeks Depends on scaleTower foundations, pool shells, watertightness test
    2. 02Tower and slide installationWeeks Depends on scaleSteel tower, GRP modules, sealed joints
    3. 03Safety and surfacesWeeks Throughout the worksSlip-resistant floors, railings, depth and warning signs
    4. 04CommissioningWeeks 1-2Wet run trials, dosing setup, staff training
  2. Pool plumbing and plant room

    Where pump, filter, pipe size and dosing fit.
    9 min

    Short answer

    Water is drawn from the pool, passes through the filter and dosing line, and returns to the pool. Pump flow is found by dividing volume by turnover time; an undersized pipe is paid back every month in electricity.

  3. Children's pool depth

    Depth by age, slip-resistant floor and transitions.
    6 min

    Short answer

    Water depth is 20-30 cm for toddlers and 30-60 cm for preschool children. The transition from shallow to deep is made gradually with a 5-7 percent ramp or wide steps.

  4. Pool water regulations

    Legal limits for pH, chlorine and testing frequency.
    10 min

    Short answer

    The regulation sets a pH range of 6.5-7.8 and a free chlorine range of 1-3 mg/L for outdoor pools. Values are measured and recorded every operating day.

  5. Annual pool operating cost

    Accounting for energy, water, chemicals and maintenance.
    7 min

    Short answer

    Annual costs fall into four items: energy, water, chemicals and maintenance. Variable speed pumps and automatic dosing directly reduce the largest item at aquapark scale.

  6. Pool investment for hotels and investors

    Seven questions to ask before deciding.
    7 min

    Short answer

    Space, power, ground load, fire safety and operating costs are settled before the design decision. Every cubic metre of water bears on the structure as roughly one tonne of load.

Showroom

Plan a showroom visit

At our showroom in Çilek Plaza, Sancaktepe, you can discuss your project with our team. We recommend booking an appointment by phone before your visit.

Working Hours

  • Monday to Friday · 08:00-17:30
  • Saturday · 08:00-12:30
  • Closed on Sunday
Directions

// 02 · Cost

Aquapark cost has two drivers, capacity and flow.

In aquapark construction, the budget is set not by the number of slides alone but by water surface, total flow and ground conditions. The six factors below explain why two aquapark quotations differ; the exact amount is confirmed by an itemised quotation after the site survey.

  • Water surface and volume

    Volume increases concrete, filtration and chemical use.

  • Ground and foundations

    The survey sets tower foundations and ground improvement.

  • Slide mix

    Tower height, module count and slide type shape the budget.

  • Hydraulics and filtration

    Total flow sets the pump group, filters and pipe sizes.

  • Wave and current systems

    Wave chamber and current pumps are separate mechanical items.

  • Safety and operation

    Slip-resistant surfaces, supervision, automation protect operation.

Aquapark in a hotel garden

// 03 · Process

An aquapark is built in eight steps, each one resting on the last.

The process starts with a soil survey and master plan, takes shape through attraction selection and hydraulic design, and moves on site with reinforced concrete and tower installation. We hand over the park after the safety layer, commissioning and staff training.

  1. Survey and master plan

    Soil survey, feasibility, zoning and capacity calculation

    Approved master plan and capacity target

  2. Attractions and hydraulics

    Slide selection, supply flows, pump and filter sizing

    Hydraulic design and itemised quotation

  3. Concrete and installation

    Pool shells, tower foundations, steel towers and GRP modules

    Tested shells and towers

  4. Safety and handover

    Slip-resistant surfaces, signage, wet run trials and training

    Commissioned aquapark

The eight steps in detail

Site Survey, Soil Study and Feasibility · 01/08

01 / 08

Site Survey, Soil Study and Feasibility

The Investment's First Photograph

An aquapark is the most heavily loaded relative in the pool family: slide towers impose heavy point loads on the ground, while pool structures and balance tanks spread over a wide area. That is why our first step is the land itself; ground bearing capacity, falls and levels, groundwater and the existing infrastructure are studied on site.

The operating side of the investment is settled at the same stage: will the park serve hotel guests, or sell day tickets? The target visitor profile, the length of the season and the water and electrical capacity are questions to be answered before the attraction list.

  • Soil study and bearing capacity
  • Site falls and level analysis
  • Water source and mains capacity
  • Electrical infrastructure and power requirement
  • Target visitor profile and season length
  • Operating model (hotel guests / day visitors)
  • Zoning and permit framework
  • Preliminary feasibility and budget range

Why it matters

In aquapark projects the most expensive mistakes begin below ground: towers and pool structures set on ground that has not been studied exact a price in settlement and leaks for years. We take no layout decision before the study is done.

// 04 · Aquapark materials

From pumps to filters, we select equipment by flow.

Circulation pumps, commercial sand and bobbin-wound filters, automatic dosing and children's water play equipment are among our products. You can review the flow, dimensions and connections of each product on its own page.

// 05 · Projects

From hotels to public facilities, our heavy-use projects.

Here we bring together the heavy-use projects we have delivered in hotels, holiday resorts and public facilities. In each project, capacity, flow and safety arrangements were calculated separately for the usage profile.

// 05 · Service regions

Across Türkiye and abroad, we build aquaparks.

We build aquaparks across Türkiye in hotel, holiday resort and municipal projects; we export to 14 countries and run international projects on site through our branches in Kyrgyzstan, Egypt, Algeria and Iraq.

Domestic

15
  • Istanbul
  • Mugla / Bodrum
  • Antalya
  • Izmir / Cesme
  • Ankara
  • Bursa
  • Kocaeli / İzmit
  • Adana
  • Mersin
  • Tekirdağ
  • Kandıra
  • Sakarya
  • Samsun
  • Denizli
  • Elazığ

International

13
All service regions

// 06 · After handover

The work does not end at opening, we manage the season together.

At handover we test every slide with running water and pass on the daily checklist, the season opening and closing routine and the emergency plan to your staff. Our workmanship carries a 2-year warranty.

  1. 012 years

    Warranty

    Our construction workmanship carries a 2-year warranty from handover; warranty documents are issued at handover.

  2. 021-2 weeks

    Commissioning and training

    We set pump programmes and dosing, and walk lifeguards and technical staff through the checklists on site.

  3. 03Daily

    Water testing

    pH and free chlorine are measured and recorded every operating day; automatic dosing keeps measuring continuously.

  4. 04Once a year

    Seasonal overhaul

    Before the season, slide joints, seals, tower connections and pump groups are inspected together.

Prepared byAli SAVAŞ · Project Manager · Mechatronics Engineer

// 07 · Questions

About aquapark construction, frequently asked questions.

Çilek Havuz Corporate

Pool & Wellness Engineering

Response Time
Same day
Channels
Phone · Email · WhatsApp

If the answer you are looking for is not here, send your question directly to us and our team will reply as soon as possible.

+90 216 475 39 37

The duration depends on the scale of the park; the schedule is given in writing after the site survey. A mid-sized hotel aquapark is in most cases planned to fit within the period when the facility is closed, while large water parks are split into phases. The critical path is the reinforced concrete water structures and slide installation.

Çilek Havuz Corporate

Yes, we make no layout decision without a survey. Slide towers impose heavy point loads on the ground, while pool shells and tanks spread over a wide area. A layout made without knowing bearing capacity and groundwater comes back as settlement, cracks and leaks.

Çilek Havuz Corporate

Capacity is calculated by dividing the water surface by the area allowed per bather for each depth. In water shallower than one metre, 2.2 m² per person is allowed, 2.7 m² at 1.0-1.5 m depth and 4 m² in deeper water. The hourly carrying capacity of the slides is added to this.

Çilek Havuz Corporate

Each slide is fed with its own constant flow. A body slide needs around 120 m³/h, and a four-person family raft slide around 400 m³/h at the start. The exact value is taken from the model's data sheet, and the pump group is selected for the sum of these flows.

Çilek Havuz Corporate

A body slide carries about 180 riders per hour. A family raft slide sends down about 180 rafts per hour; with a four-person raft that means 720 riders. Queue times are calculated from this capacity and the number of visitors on the busiest day.

Çilek Havuz Corporate

Turnover time shortens as depth decreases, because bather density rises in shallow water. Recommended times are 10-45 minutes in water below 0.5 m, 30-75 minutes at 0.5-1.0 m, 1-2 hours at 1.0-1.5 m and 2-2.5 hours in deeper water. In spray play areas the time falls to 20 minutes.

Çilek Havuz Corporate

Water slides 2 m high or more are designed and tested to the European water slide safety standard. These rules cover safety requirements, the splash pool and exit zone, and the instructions for use and maintenance. Pool water is monitored under the pool water regulation in force in Türkiye.

Çilek Havuz Corporate

Zero-depth water play areas, play structures with tipping buckets, mini slides and spray floors suit small children. Water depth in the toddler zone is 20-30 cm, and the zone is planned as a separate area with an uninterrupted lifeguard line of sight.

Çilek Havuz Corporate

Cost depends on water surface, ground conditions, the slide mix and total flow. Wave pools and lazy rivers need separate mechanical systems, and safety, automation and the plant room are also part of the budget. The exact amount is confirmed by an itemised quotation after the site survey.

Çilek Havuz Corporate

Yes, adding an aquapark or a children's area with slides to an existing hotel garden is one of the jobs we carry out most often. During the site survey we assess the existing plant room, water and power capacity and ground conditions. The works are scheduled for the facility's closed period so the season is protected.

Çilek Havuz Corporate

The largest items are energy, water and chemicals, and all three are determined at the design stage. Variable speed pumps, correctly sized filtration and automatic dosing reduce annual costs. We recommend basing the decision on total cost of ownership rather than installation price.

Çilek Havuz Corporate

pH and free chlorine are measured and recorded every operating day. The regulation sets a pH range of 6.5-7.8 and a free chlorine range of 1-3 mg/L for outdoor pools. Automatic dosing and measuring points keep these values within range even at the busiest hour.

Çilek Havuz Corporate

Çilek Havuz builds aquaparks across Türkiye in hotel, holiday resort and municipal projects. We export to 14 countries and run international projects through our branches in Kyrgyzstan, Egypt, Algeria and Iraq.

Çilek Havuz Corporate

Yes, at handover we pass on staff training, daily checklists and the season opening and closing routine to your team. After that we stay alongside the park with a maintenance contract, a spare parts plan and a pre-season overhaul. Our workmanship carries a 2-year warranty.

Çilek Havuz Corporate

Next step

Let us discuss your project in the way that suits you best.

You can fill in the form for a written quote, schedule a video project presentation or ask us to survey your project site.

  • Get a Quote

    Send us your dimensions and expectations in writing.

  • Online presentation

    Video project presentation

  • On-site survey

    Inspection at your project site

// 08 · Company & Contact

To talk about your project, call or write to us.

Legal Name

Çilek Havuz

Founded

1998 · Istanbul

Head Office

Çilek Plaza, Eyüp Sultan Mah. Yakacık Cd. Feshane Cd. No: 2 D:4 D:1, 34885 Sancaktepe / İstanbul

Service Area

All of Türkiye · exports to 14 countries

Branches

Kyrgyzstan · Egypt · Algeria · Iraq

Showroom

Plan a showroom visit

At our showroom in Çilek Plaza, Sancaktepe, you can discuss your project with our team. We recommend booking an appointment by phone before your visit.

Working Hours

  • Monday – Friday · 08:00 – 17:30
  • Saturday · 08:00 – 12:30
  • Closed on Sunday
Directions