Skip to content
Çilek Havuz

// UAE · Dubai and Abu Dhabi

Pools, hammams and spas in Dubai and the UAE

Çilek Havuz designs rooftop and villa pools, Turkish hammams, saunas, steam rooms and hotel spas for the UAE. Each part is produced in our workshop in Turkey, shipped by container to Jebel Ali or Khalifa Port and installed by our own team alongside your licensed contractor. Abu Dhabi and Dubai are our focus; every completed project to date is in Turkey.

Glass-edged infinity pool facing the sea
28+
years building pools
14
Export Countries
15
service lines
3
emirates covered

Send the slab details

Drawings, slab data if you have it and the room list. Our answer is a scope and a clear split of work.

// 01 · Approval to handover

How we deliver a UAE pool or spa

Five steps timed to the building approval, the fit-out calendar and the port, so our team arrives when the slab is ready.

  1. Pool drawings checked with material samples before approval

    Brief and plans

    Share drawings, photos and the rooms you want. Our answer is a scope plus the questions still open.

  2. Overflow edge with water over dark stone, close up, Hadımköy (Turkey)

    Drawings for approval

    Loads, waterproofing, drainage and power are drawn so your contractor can file them.

  3. Welding pool pipework in the workshop, Istanbul (Turkey)

    Production in Turkey

    Marble is cut and numbered, pipework prefabricated and equipment tested before packing.

  4. Site check on a reinforced pool shell

    Container to Jebel Ali or Khalifa

    Crates arrive in fitting order, with certificates and packing lists for customs.

  5. Filters and pumps ready for start-up in a plant room

    Installation and handover

    Installers fit, flood-test and start the systems, then brief the building or hotel team.

Pools, hammams and spas in Dubai and the UAE: Selected work in Turkey

Selected work in Turkey

06 media

// 02 · Numbers first

Six numbers behind a UAE pool or spa

Climate records, one load figure and normal operating ranges we check on every Emirates brief. No prices.

Dubai, July high

41°C

How hot is Dubai in summer?

Around 41 °C on an average July day, so chilling, shade and a ventilated plant room are drawn from the first sketch.

Request a quotation
Villa pool lit at night among palms, Çekmeköy (Turkey)

// 03 · Before you start

Rooftop pools, villa spas and hotel wellness in the Emirates

In Dubai and Abu Dhabi the pool is often on a roof, a podium or a tower terrace, and the spa sits inside a fitted-out floor. These six topics decide what can be built and how.

Written by Ali SAVAŞ

Rooftop and podium pools: load and waterproofing

Every cubic metre of pool water weighs about a tonne, before finishes, people and the balance tank are added.

  • The building's structural engineer confirms what the slab can carry, and the pool depth, the overflow channel and the tank are drawn to that limit.
  • Waterproofing runs as a continuous system under the shell and up the walls, and it is tested with water before any tile goes on.
  • Plant rooms on a roof need access for lifting pumps in and out.
Hotel rooftop pool lit at night, Istanbul (Turkey)

Compare

Rooftop or garden, hammam or steam: choosing in the UAE

Our default for a Dubai or Abu Dhabi home: an overflow pool on a chiller over a flood-tested membrane, plus a steam room or hammam on the same plant. The table explains the exceptions.

QuestionRoute ARoute BOur advice
Pool locationRoof or podiumGround levelRoof or podium where the view matters and the slab allows; ground level for villas with a garden
Pool edgeOverflowSkimmerOverflow for terraces that show the water line; skimmer where load and budget are tight
Hot roomTurkish hammamSteam roomHammam where floor load and area allow; steam room for apartments and compact suites
CoolingChillerReversible heat pumpChiller for large or rooftop pools; heat pump for villa pools that also want winter warmth
SanitisingSalt chlorinatorDosed chlorineSalt chlorinator for low-effort dosing; dosed chlorine near exposed coastal metalwork

Design studio

Sketch the pool before we talk

Set the location, the edge and the chilling. We check your picks against the drawings and come back with a scope.

Location
Edge
Water
Villa pool with a round spa pool, seen from above, Silivri (Turkey)
10 × 4 mRooftopOverflowChiller

// 05 · References

Finished work in Turkey

We have not yet completed a project in the Emirates, and we state it openly. These rooftop, villa and hotel projects in Turkey come from the same workshop and installers.

All projects

// 06 · Cities and regions

Where we work in the Emirates

Abu Dhabi is the capital and Dubai the busiest market for towers, villas and hotels; Sharjah and the northern emirates add family villas.

  1. Abu DhabiCapital

    The capital: villas on the islands, hotel resorts and government-linked developments with large spa programmes.

    July 42 °C · January 13 °C · no frost

    Talk about this emirate
  2. Dubai

    Towers with rooftop and podium pools, villa communities and hotels. Fit-out approvals and tight access shape every job.

    July 41 °C · January 15 °C · no frost

    Talk about this emirate
  3. Sharjah and the northern emirates

    Family villas and hotels in Sharjah, Ajman and Ras Al Khaimah, often with a private pool and a steam room.

    July 41 °C · January 14 °C · no frost

    Talk about this emirate

// 07 · Common mistakes

Errors we see on UAE pools and spas

Rooftops and chilled towers punish shortcuts. These five are the expensive ones.

Villa pool on an open lawn in strong sun, Istanbul (Turkey)
  1. Depth fixed before the load check

    The pool is drawn to the client's wish and the slab is checked later. The design then shrinks on site. Start from the structural limit.

  2. Waterproofing not flood-tested

    Tiles go on before the membrane is tested. A leak shows up in the flat below, and the whole finish comes off. Test with water first.

  3. No lifting route to the roof plant

    Pumps and chillers are placed where nobody can take them out. Replacing one needs a crane. Plan access with the plant room.

  4. Steam room against a chilled wall

    The hot room shares a wall with an air-conditioned bedroom and no vapour barrier. The cold side sweats and mould follows.

  5. Pool left open in summer

    No shade, no cover, no chiller. Water passes 32 °C, evaporation is heavy and chemicals climb. Plan all three from day one.

// 08 · Cost

Cost drivers for UAE pools and spas

Structure, approvals and chilling set the budget more than the water area does. Quotes follow drawings, so no numbers appear here.

FactorWhat it changes
Structure and locationA rooftop or podium pool needs more design, waterproofing and lifting than a garden pool.
Cooling loadMore sun and surface mean a bigger chiller; shade and a cover make it smaller.
Edge and balance tankOverflow edges add a channel, a tank and more pipework.
Hot rooms and finishesMarble grade, platform size and mosaic choice change stonework time.
Access and working hoursTower access, lift bookings and summer site hours stretch the programme.
Contractor scopeThe more civil and licensed work the local contractor holds, the fewer lines we carry.

Your handover file

  1. As-fitted drawings of pool, plant and hot rooms.
  2. Flood test, pressure test and start-up sheets.
  3. A briefing for the building, villa or hotel team.
  4. Service plan for pool, chiller, steam room and sauna.
  5. Parts list for a local stock in Dubai or Abu Dhabi.
  6. Conformity certificates and product manuals.

// 09 · Frequently asked questions

Questions about projects in the Emirates.

Çilek Havuz Technical Team

Pool & Wellness Engineering

Response Time
Same day
Channels
Phone · Email · WhatsApp

If the answer you are looking for is not here, send your question directly to us and our team will reply as soon as possible.

Request a quotation

Yes, once the building's structural engineer has confirmed the load. Each cubic metre of water weighs about a tonne, so depth, channel and balance tank are drawn to the slab's limit.

Çilek Havuz Technical Team

Not in the Emirates so far. We deliver as a manufacturer-installer from Turkey, and our completed rooftop, villa and hotel work is in Turkey, with details on the projects page.

Çilek Havuz Technical Team

With a continuous system under the shell and up the walls, flood-tested before tiling. Pipe penetrations get sealed collars, and the overflow channel is waterproofed with the shell.

Çilek Havuz Technical Team

In most towers and communities the building management or the developer approves pool and spa fit-out drawings. We prepare them; your contractor files them.

Çilek Havuz Technical Team

In a large apartment, yes, if the floor can carry the marble platform and the steam can be extracted to outside. Otherwise a steam room gives a similar experience in less space.

Çilek Havuz Technical Team

Installers from our own team in Turkey. The licensed local contractor handles structure, power and any trade that needs a local licence; the contract spells out the split.

Çilek Havuz Technical Team

There is no honest figure without drawings. Structure, waterproofing, chilling, finishes and the fit-out contractor's share all move the price, and each appears as its own line.

Çilek Havuz Technical Team

Jebel Ali for Dubai and the northern emirates, Khalifa Port for Abu Dhabi. Crates are packed in the order of installation.

Çilek Havuz Technical Team

// 10 · Quotation

Tell us about the tower, villa or hotel

Name the emirate, add drawings or photos and list the rooms. Our reply sets out the scope and what your contractor would cover.

Phone:+90 216 475 39 37

Are you an installer, dealer or architect in the region? Become a partner

Villa pool terrace at dusk with loungers
  1. Send drawings and slab data
  2. Get the scope and open points
  3. Plan the crew with the fit-out team