What turnkey pool construction is, what it covers and what it leaves out
In a turnkey pool, design, procurement, construction and commissioning go to one contractor under one contract; the scope schedule draws the line.
Project Manager · Mechatronics Engineer · Çilek Havuz
- Published
- Updated
- Reading
- 10 min read
- Category
- Pool Construction
In a turnkey pool, design, procurement, construction and commissioning go to one contractor under one contract; the scope schedule draws the line.
Turnkey pool construction is the model in which design, procurement, construction, commissioning and operator training for a pool project are awarded to a single contractor under a single contract.
A turnkey project is one built so that it can be handed to the buyer as a finished product; the term comes from the idea that the client only needs to turn the key once they take it over. The contractor delivers the work ready for use, for an agreed price and on a fixed date, and after completion carries the legal responsibility for design, fitness for purpose and performance.
For a pool, this means the client does not coordinate between the excavation crew, the concrete contractor, the plumber, the tiler and the equipment supplier. There is one point of contact, and that party is responsible for the pool holding water, the equipment working and the water staying in balance. This article explains what the model is, where the scope ends, and how the contract and stage payments are set up; the technical sequence of the build is the subject of a separate article on construction stages.
Most disputes start at the edge of the scope.
The table below gives the typical turnkey scope for a reinforced concrete villa pool and the items that fall outside it; in every contract the table is rewritten for the project and signed by both parties.
| Item | Included | Excluded (quoted separately) |
|---|---|---|
| Design | Geotechnical survey coordination, preliminary design, structural and mechanical construction drawings, as-built drawings | Landscape architecture design, garden lighting design |
| Permit | Preparing the permit file and submitting it to the municipality | Permit and zoning fees, chamber of architects and engineers approvals |
| Excavation and ground | Setting out, excavation, spoil removal, perimeter drainage, blinding concrete | Rock excavation allowance set by the survey; ground improvement as a separate item |
| Shell | Reinforcement, formwork, C30/37 concrete, waterstop, curing, test samples | Retaining and terrace walls outside the pool |
| Pipework | Suction and return lines, main drain, balance tank lines, pressure test | Bringing the plot's main water and power supply to the plant room |
| Plant room | Installation of pump, filter, dosing, heat pump and control panel | The plant room structure (building) and dehumidification unit, unless written separately into the contract |
| Waterproofing and finish | Flexible waterproofing, water-tightness test, ceramic or glass mosaic, epoxy grout, coping stone | Pool surround paving and decking, unless written into the contract by the square metre |
| Commissioning | First fill (excluding the cost of the water), water balancing, automation settings, operator training | Cost of the first-fill water, first-season chemical stock |
| Handover documents | Commissioning report, handover certificate, equipment warranty documents, operating manual | Insurance policies |
The three most disputed rows of the table are the pool surround paving, the plant room structure and the main supply lines. All three are needed for the pool to work, but none is part of the pool shell; in a turnkey quotation they are either written in square metres and metres or explicitly excluded. An item that is not written down is the item argued over at handover.
A turnkey contract brings the scope schedule, the technical specification, the programme, the payment plan and the warranty terms together in one document.
The technical specification covers the concrete class, water/cement ratio, reinforcement, waterproofing layer, finish material, equipment make and model, and target water values; work that is not specified gets built in its cheapest form. The programme leaves an allowance for weather and permit time and defines delay penalties in both directions.
Mandatory clauses of a turnkey pool contract
- 01Scope schedule: included and excluded items, with square metre and metre units.
- 02Technical specification: concrete class and water/cement ratio, reinforcement, waterproofing, finish, equipment list (make, model, capacity), target water range.
- 03Ground conditions clause: a unit rate for rock and groundwater, or an additional item tied to the survey; it prices the surprise inside the contract.
- 04Programme: start condition (permit and advance payment), stage dates, weather and permit allowance.
- 05Payment plan: the document each payment depends on (record, test, report).
- 06Acceptance and handover: commissioning report, water-tightness test result, operator training and the list of documents.
- 07Warranty: separate periods for shell water-tightness, finish and equipment (manufacturer warranty), and exclusions for misuse.
- 08Change management: the written price and time effect of every change made at the client's request.
Two sentences in the definition of turnkey form the backbone of the contract: the work is delivered ready for use for an agreed price and on a fixed date, and after completion the contractor carries responsibility for design, fitness for purpose and performance. The second sentence requires the contractor to draw or approve the design itself; a contractor who builds someone else's design without questioning it cannot take on turnkey responsibility.
In the turnkey model, payment is tied not to a calendar date but to the document proving the completed work.
Each stage payment matches the check output of one construction stage: the first payment with the geotechnical report and approved design, the second with the excavation level record and drainage photographs, the third with the concrete test samples and pour record, the fourth with the pressure test and water-tightness test records, the fifth with the finish checklist, and the final payment with the commissioning report and handover certificate. This arrangement saves the client from paying for work they have not seen, and the contractor from defending work that was never documented.
This is the rule we have applied in the pool projects we have commissioned since 1993: design first, payment second. The turnkey contract is signed once the design and ground survey are complete; the survey and preliminary design stage before it is carried out for a separate, small fee or within the scope of the quotation.
A turnkey pool is handed over with a complete file.
Without that file the owner knows neither where the buried pipes run nor which settings the equipment runs on; at the first fault the contractor is called, and every call becomes a warranty argument. The contents of the file are listed in the contract, and the final payment is tied to its delivery.
Handover file
- As-built drawings: shell dimensions, buried pipe routes, balance tank and plant room layout.
- Test records: concrete sample results, pipework pressure test, water-tightness test.
- Commissioning report: first-fill water values, filter starting pressure, pump run times, dosing and automation settings.
- Equipment file: make, model, serial number, warranty document and user manual for every unit.
- Operating manual: weekly maintenance list, test log template, chemical storage rules, winterising and opening instructions.
- Training record: date and content of the operator training given to the owner or staff.
- Warranty certificate: periods and scope for the shell, finish and workmanship.
Glossary
- Turnkey
- Awarding design, procurement, construction, commissioning and training to a single contractor under a single contract; the contractor carries performance responsibility after completion.
- Scope schedule
- The table annexed to the contract that lists included and excluded items with their units; the safeguard against handover disputes.
- Technical specification
- The document setting out concrete class, reinforcement, waterproofing, finish, equipment and target water values; work that is not specified gets built in its cheapest form.
- Stage payment
- An interim payment made against a completed work item; in the turnkey model each stage payment is tied to a document.
- As-built
- The final drawings made of the work as it was actually built; the first item in the handover file.
- Change order
- The written price and time effect of work requested by the client after the contract is signed; a verbal change creates a scope dispute.
In our exports to 14 countries, the turnkey model uses the same scope schedule as at home, with three items added.
The first is logistics: the equipment travels by container, customs and conformity documents enter the programme, the container packing list is derived from the commissioning sequence, and a spare parts allowance is added. The second is labour: the structural work is done by a local crew, while pipework and commissioning are carried out under the supervision of our Turkish technical team. The third is the operational handover: training and the operating manual are prepared in the local language. In Algeria we delivered the complete spa of the Sofitel Algiers Hamma Garden for CSCEC using this model.
The turnkey model comes from the idea of delivering a complete whole that the buyer only has to switch on, and it differs both from manufacturing to the buyer's full specification and from the buyer finishing an incomplete product themselves.
Established in industrial plant and building construction, the model brings two features to the fore when adapted to pools: a pool is a structure that can be tested with water, so performance is measured at handover; and a pool is operated every week after handover, so training and the manual are part of the product.
The short rule follows from this: turnkey pool construction starts with a scope schedule, its price is fixed once the ground survey and design are complete, each stage payment is tied to a document, there is no handover before the water-tightness test and commissioning report are passed, and no final payment is taken without the handover file. The model gathers responsibility for the pool construction process in one place; the condition is that the contractor taking that responsibility draws or approves the design itself.
Next step
Let us discuss your project in the way that suits you best.
You can fill in the form for a written quote, schedule a video project presentation or ask us to survey your project site.
Get a Quote
Send us your dimensions and expectations in writing.
Online presentation
Video project presentation
On-site survey
Inspection at your project site
// 01 · Product groups
Compare the products on this topic on their category pages.
Each card leads to a product category; models, technical sheets and list prices are there.

Product category
Pool Mechanical Equipment
Circulation pumps, filters, valves and automation: the mechanical infrastructure that forms the heart of the pool.
65 products
Product category
Pool Lining Systems
PVC liner, membrane, ceramic tile and glass mosaic: lining materials that make the pool watertight and form its finished surface.
20 products
Product category
Pool Disinfection Systems
Fully automatic pool water disinfection that reduces chemical use with salt electrolysis, UV disinfection and smart dosing systems.
52 products
// 02 · Related service
The work in this article, we deliver from design to handover.

Çilek Havuz service
Swimming Pool Construction
Reinforced-concrete, prefabricated and infinity swimming pools, built turnkey for villa, residential and commercial projects.
Swimming pool construction is a turnkey build in which the site survey, structural and mechanical design, excavation, reinforced-concrete shell, waterproofing, finish, filtration plumbing and commissioning run under a single contract. The written project schedule follows the site survey.
How we work
- 01Initial meeting and site surveyWe inspect the site and listen to the brief.
- 02Design and quotationWe give the cost item by item, in writing.
- 03ExecutionThe same team builds to a written schedule.
- 04Handover and commissioningWe start the systems and explain their use.
- 05Maintenance and technical supportWe provide periodic maintenance and support.
// 03 · Guides
On Pool Construction, more articles to read.
First the articles directly related to this one, then the newest articles on the topic.
Pool Construction · 28 May 2026Building a Pool From Scratch: A Step-by-Step Engineering GuideHow a pool gets built, in order: site visit and permits, design, excavation, the concrete shell, waterproofing, finishes, plant room and handover. How long each stage takes and what to check in a quote.9 min read
Pool Construction · 9 September 2026Swimming pool construction stages: the order of 12 steps from site survey to stage paymentPool construction starts with a site survey and a ground investigation; each of the 12 steps through design, excavation, shell, pipework, waterproofing, finish and handover closes with a checkpoint.10 min read
Pool Construction · 9 September 2026Pool construction in Samsun: what do climate and groundwater change?Pool construction in Samsun is a reinforced concrete pool project shaped by a humid subtropical climate, 729.7 mm of rain a year and high groundwater in the delta alluvium.9 min read
Pool Construction · 2 October 2026Choosing Pool Showers and Waterfalls: Shower Types, Water Curtains and Plumbing NeedsChoosing a pool shower, waterfall or water curtain depends on the material, where the water comes from and where it is mounted. We compare solar and stainless steel shower types and their pump and plumbing needs.8 min read
Pool Construction · 2 October 2026Competition Pool Equipment: Which Pool Needs Which Equipment?Starting blocks, lane ropes, warning and turn systems, underwater speakers and water polo goals are chosen according to how the pool is used. We explain which dimensions we check for each item.7 min read
Pool Construction · 29 September 2026Building a pool or spa abroad: what drives the cost of an international project?A pool, hammam or spa project delivered abroad from Turkey has no single price per square metre. We cover design, equipment, shipping, customs and schedule.8 min read
// Sources and regulations
Sources and regulations
The official documents behind the technical framework on this page; links open the institutions' own sites.
- Regulation on the Health Principles and Conditions for Swimming Pools (Official Gazette No. 27866, 6 March 2011)Official Gazette of Türkiye
- Regulation Amending the Swimming Pools Regulation (Official Gazette, 15 December 2011)Official Gazette of Türkiye
- Guidelines for safe recreational water environments, Volume 2: Swimming pools and similar environments
// 04 · Company & Contact
To talk about your project, call or write to us.
Legal Name
Çilek Havuz
Founded
1998 · Istanbul
Head Office
Çilek Plaza, Eyüp Sultan Mah. Yakacık Cd. Feshane Cd. No: 2 D:4 D:1, 34885 Sancaktepe / İstanbul
Service Area
All of Türkiye · exports to 14 countries
Branches
Kyrgyzstan · Egypt · Algeria · Iraq
Showroom
Plan a showroom visit
At our showroom in Çilek Plaza, Sancaktepe, you can discuss your project with our team. We recommend booking an appointment by phone before your visit.
Working Hours
- Monday – Friday · 08:00 – 17:30
- Saturday · 08:00 – 12:30
- Closed on Sunday
Frequently Asked Questions
About What turnkey pool construction is, what it covers and what it leaves out, frequently asked questions.
Çilek Havuz Corporate
Pool and Wellness Engineering
- Response Time
- Same day
- Channels
- Phone · Email · WhatsApp
If the answer you are looking for is not here, send your question directly to us and our team will reply as soon as possible.
+90 216 475 39 37The quote covers design (structural and mechanical), the permit file, excavation and drainage, and the reinforced concrete shell. Pipework and plant room equipment, waterproofing and finish, commissioning, operator training and the handover file are also included. Pool surround paving, the plant room structure, main water and power lines and the first-fill water are excluded unless written separately into the contract. We prepare the municipal process and all the structural, electrical and architectural drawings required for the pool permit.
Çilek Havuz Corporate
When the ground survey and construction drawings are complete. Any figure given before that is a budget estimate and changes if rock or groundwater is found. The ground conditions clause in the contract prices these possibilities in advance with unit rates.
Çilek Havuz Corporate
Payment is made through stage payments tied to documents. The documents are the approved design, excavation record, concrete samples, pressure and water-tightness test records, finish checklist and commissioning report. No payment is tied to a calendar date; the rule is design first, payment second.
Çilek Havuz Corporate
As-built drawings, test records, the commissioning report, and equipment warranty documents and manuals are handed over. The operating manual, the training record and the warranty certificate are also part of the handover file. The final payment is tied to the delivery of this file.