Tekirdağ Coastal Villa Pool Construction
Along the Marmara shoreline, in weekend villa districts close to Istanbul, we build reinforced concrete, prefabricated and skimmer pool projects.
Çilek Havuz in Numbers
We build dependable pools across the Tekirdağ region with 2026 years of engineering experience.
- 33+
- Years
- 14
- Export
- 350+
- Projects
Tekirdağ Coastal Villa Pool Construction — Frames from Our Projects
Frames from Our Projects
06 media
Let Us Call You
Leave four details and your account manager will call you about projects in the Tekirdağ region — or reach us directly on the lines below.
Before You Decide
With winter maintenance chemicals and a safety cover, the pool is protected all winter without draining, allowing a fast spring start-up.
There is no single price per square metre for every project in the Tekirdağ region — ground and system choice can put two identically sized gardens in completely different budgets. A photo of the garden and basic measurements are enough for a rough estimate; a firm quote is prepared only after an on-site survey.
We prepare both permitted and non-permit pool projects in line with the zoning regulations of Tekirdağ's district municipalities.
Because of Tekirdağ's Marmara coastal climate and windy conditions, reinforced surface-weir design and winter protection are applied as standard.
Our Projects in Motion

Türkiye's Deepest Training Pool · Mechanical System
November 2025 · 0:44

Türkiye's Deepest Training Pool · 10 Metres
August 2025 · 2:28

Sapanca Çetin Bey
Sapanca · April 2022 · 0:52

Şile Cihan Bey
İstanbul · July 2021 · 0:38
Pool Type Comparison
Every project tells its own story; together we choose the right pool.
- Installation
- 6–8 Weeks
- Lifespan
- 20+ Years
- Warranty
- 2 Years
- Custom Shape
- Variable Depth
- Infinity Edge
- Indoor
- Heating System
- Automation
- Waterfall
- LED Lighting
- Installation
- 2–3 Weeks
- Lifespan
- 5–10 Years
- Warranty
- 2 Years
- Custom Shape
- Variable Depth
- Infinity Edge
- Indoor
- Heating System
- Automation
- Waterfall
- LED Lighting
- Installation
- 1 Week
- Lifespan
- 5–10 Years
- Warranty
- 2 Years
- Custom Shape
- Variable Depth
- Infinity Edge
- Indoor
- Heating System
- Automation
- Waterfall
- LED Lighting
Because of Tekirdağ's Marmara coastal climate and windy conditions, reinforced surface-weir design and winter protection are applied as standard.
See the waterproofing detailWe prepare both permitted and non-permit pool projects in line with the zoning regulations of Tekirdağ's district municipalities.
See the permit processCompany & Contact
To talk about your project, we are one call away.
Legal Name
Çilek Havuz
Founded
1998 · Istanbul
Head Office
Çilek Plaza, Eyüp Sultan Mah. Yakacık Cd. Feshane Cd. No: 2 D:4 D:1, 34885 Sancaktepe / İstanbul
Service Area
All of Türkiye · exports to 14 countries
Tekirdağ Most Preferred Pool Solutions in the Region
Skimmer Summer Villa PoolReinforced Concrete Garden PoolPrefabricated Panel PoolCompact Pool
How Does the Turnkey Process Work?
A standard villa pool passes through these five stages, from excavation to filling, and is delivered turnkey in about 20–35 working days. The exact schedule depends on size, weather, ground conditions and the chosen finish.
Survey & Design
Excavation & Structural Concrete
Curing & Waterproofing
Finishing & Mechanical Installation
Commissioning
What Determines the Price?
There is no single price per square metre that fits every project in the Tekirdağ region; ground and system choice can put two identically sized gardens in completely different budgets. A photo of the garden and basic measurements are enough for a rough estimate — a firm quote follows the site survey.
See the cost items in detailPool Systems Suited to Tekirdağ Projects
Skimmer Summer-House Villa Pool
The most preferred system in seasonal-use areas such as Marmara Ereğlisi and Şarköy.
Reinforced Concrete Garden Pool
Preferred in permanent villa projects for its freedom in size and form.
Prefabricated Pool
Built with a factory-made shell where fast delivery before a short season is the goal.
What Should You Check When Choosing a Pool Company?
Two quotes are usually compared side by side, yet their scopes are rarely the same. We suggest asking these four questions before you look at the total:
Is the Scope Clearly Stated?
It must state clearly which of excavation, concrete, waterproofing, mechanical, electrical, finishing and surrounding works are included
Has Filtration Been Calculated?
Filter and pump are not just a catalogue pick; they must be sized to pool volume, pipe runs and intensity of use
Are Equipment Brand/Model Given?
"Pump and automation included" is not enough on its own — brand, model, capacity and warranty terms must appear in the quote
Are There Real Project References?
Not just renders — you should be able to see completed projects with known size, system, year and location.
Frequently Asked Questions
Tekirdağ pool construction; clear answers.
Çilek Havuz — Tekirdağ
Pool & Wellness Engineering
- Response Time
- Same day
- Channels
- Phone · E-mail · WhatsApp
If the answer you are looking for is not here, send your question directly to us and our team will reply as soon as possible.
Book a free site surveyA standard villa pool is delivered turnkey in about 20–35 working days, from excavation to filling. The sequence runs through survey and design, excavation and structural concrete, curing and waterproofing, finishing and mechanical installation, then commissioning; the exact schedule depends on size, weather, ground conditions and the chosen finish.
Çilek Havuz — Tekirdağ
There is no single price per square metre that fits every project in Tekirdağ — ground conditions and system choice can put two identically sized gardens in completely different budgets. The real cost drivers are: the pool's net dimensions and depth, the system, excavation and site access, ground and drainage requirements, filter–pump–automation capacity, waterproofing, heating or an automatic cover, and the surrounding landscaping. A photo of the garden and basic measurements are enough for a rough estimate; a firm quote follows only after an on-site survey.
Çilek Havuz — Tekirdağ
We prepare both permitted and non-permit pool projects in line with the zoning regulations of Tekirdağ's district municipalities.
Çilek Havuz — Tekirdağ
Because of Tekirdağ's Marmara coastal climate and windy conditions, reinforced surface-weir design and winter protection are applied as standard.
Çilek Havuz — Tekirdağ
Skimmer Summer-House Villa Pool: The most preferred system in seasonal-use areas such as Marmara Ereğlisi and Şarköy. Reinforced Concrete Garden Pool answers a different need — Preferred in permanent villa projects for its freedom in size and form. The right choice is made together during the site survey, based on the slope, the view and the delivery time you are aiming for.
Çilek Havuz — Tekirdağ
Reinforced skimmer and surface-weir design against coastal winds, winter protection included.
Çilek Havuz — Tekirdağ
With winter maintenance chemicals and a safety cover, the pool is protected all winter without draining, allowing a fast spring start-up.
Çilek Havuz — Tekirdağ

