Elazığ Pool Construction: Frost-Resistant Villa and Indoor Pools
Set at roughly 1,000 m elevation in Eastern Anatolia, Elazığ has a continental climate. For detached homes, hotels and residential complexes in the central district and around Lake Hazar, we build reinforced-concrete outdoor and indoor pools engineered for the continental climate, dry air and the seismic loads of the East Anatolian Fault Zone.
Çilek Havuz in Numbers
We build dependable pools across the Elazığ region with 2026 years of engineering experience.
- 33+
- Years
- 14
- Export
- 350+
- Projects
Elazığ Pool Construction: Frost-Resistant Villa and Indoor Pools — Frames from Our Projects
Frames from Our Projects
06 media
Let Us Call You
Leave four details and your account manager will call you about projects in the Elazığ region — or reach us directly on the lines below.
Before You Decide
No; the water is not drained. The level is lowered below the skimmer, pipes are blown out with compressed air and plugged, winter chemicals are added and a cover is fitted. A reinforced-concrete pool left empty gets pushed and cracked by groundwater and frost from below; a full, covered pool gets through winter safely.
There is no single price per square metre for every project in the Elazığ region — ground and system choice can put two identically sized gardens in completely different budgets. A photo of the garden and basic measurements are enough for a rough estimate; a firm quote is prepared only after an on-site survey.
In Elazığ Municipality and the district municipalities, a pool is processed as an addition to the building permit with structural and mechanical plans; in this seismic zone, a soil survey and structural calculation are mandatory. For plots along Lake Hazar, coastal edge line and protection zone regulations are verified before the project starts.
Elazığ's continental climate shapes the pool on three points: January averages below zero, with nights down to -20 °C, so freeze-thaw resistance (air-entrained concrete, frost-rated finish, a winterizing protocol) is mandatory for outdoor pools; July highs above 30 °C combined with relative humidity below 40 percent roughly double evaporation compared with the Black Sea coast, which is why a cover and automatic water top-up are built into the design; annual rainfall of around 420 mm simplifies drainage. The ground consists of the Elazığ basin's alluvial and limestone layers; because of the East Anatolian Fault Zone that produced the 2020 Sivrice earthquake, the shell and plant room are calculated to a high seismic load class.
Our Projects in Motion

Türkiye's Deepest Training Pool · Mechanical System
November 2025 · 0:44

Türkiye's Deepest Training Pool · 10 Metres
August 2025 · 2:28

Sapanca Çetin Bey
Sapanca · April 2022 · 0:52

Şile Cihan Bey
İstanbul · July 2021 · 0:38
Pool Type Comparison
Every project tells its own story; together we choose the right pool.
- Installation
- 6–8 Weeks
- Lifespan
- 20+ Years
- Warranty
- 2 Years
- Custom Shape
- Variable Depth
- Infinity Edge
- Indoor
- Heating System
- Automation
- Waterfall
- LED Lighting
- Installation
- 2–3 Weeks
- Lifespan
- 5–10 Years
- Warranty
- 2 Years
- Custom Shape
- Variable Depth
- Infinity Edge
- Indoor
- Heating System
- Automation
- Waterfall
- LED Lighting
- Installation
- 1 Week
- Lifespan
- 5–10 Years
- Warranty
- 2 Years
- Custom Shape
- Variable Depth
- Infinity Edge
- Indoor
- Heating System
- Automation
- Waterfall
- LED Lighting
Elazığ's continental climate shapes the pool on three points: January averages below zero, with nights down to -20 °C, so freeze-thaw resistance (air-entrained concrete, frost-rated finish, a winterizing protocol) is mandatory for outdoor pools; July highs above 30 °C combined with relative humidity below 40 percent roughly double evaporation compared with the Black Sea coast, which is why a cover and automatic water top-up are built into the design; annual rainfall of around 420 mm simplifies drainage. The ground consists of the Elazığ basin's alluvial and limestone layers; because of the East Anatolian Fault Zone that produced the 2020 Sivrice earthquake, the shell and plant room are calculated to a high seismic load class.
See the waterproofing detailIn Elazığ Municipality and the district municipalities, a pool is processed as an addition to the building permit with structural and mechanical plans; in this seismic zone, a soil survey and structural calculation are mandatory. For plots along Lake Hazar, coastal edge line and protection zone regulations are verified before the project starts.
See the permit processCompany & Contact
To talk about your project, we are one call away.
Legal Name
Çilek Havuz
Founded
1998 · Istanbul
Head Office
Çilek Plaza, Eyüp Sultan Mah. Yakacık Cd. Feshane Cd. No: 2 D:4 D:1, 34885 Sancaktepe / İstanbul
Service Area
All of Türkiye · exports to 14 countries
Elazığ Most Preferred Pool Solutions in the Region
Frost-Resistant Reinforced-Concrete Villa PoolHeated Indoor PoolLake Hazar Summer PoolHotel and Residential Complex Pool
How Does the Turnkey Process Work?
A standard villa pool passes through these five stages, from excavation to filling, and is delivered turnkey in about 20–35 working days. The exact schedule depends on size, weather, ground conditions and the chosen finish.
Survey & Design
Excavation & Structural Concrete
Curing & Waterproofing
Finishing & Mechanical Installation
Commissioning
What Determines the Price?
There is no single price per square metre that fits every project in the Elazığ region; ground and system choice can put two identically sized gardens in completely different budgets. A photo of the garden and basic measurements are enough for a rough estimate — a firm quote follows the site survey.
See the cost items in detailPool Systems Suited to Elazığ Projects
Frost-Resistant Reinforced-Concrete Villa Pool
An outdoor pool system for detached homes in central Elazığ, planned with air-entrained concrete, a frost-rated finish and a winterizing protocol.
Heated Indoor Pool
For homes and hotels wanting year-round use through the long winter, an indoor pool is built with a dehumidification unit, heat pump and sub-floor insulation.
Lake Hazar Summer Pool
For summer homes in Sivrice, a prefabricated shell or compact reinforced-concrete pool is applied with a short construction period and siting compliant with coastal regulations.
What Should You Check When Choosing a Pool Company?
Two quotes are usually compared side by side, yet their scopes are rarely the same. We suggest asking these four questions before you look at the total:
Is the Scope Clearly Stated?
It must state clearly which of excavation, concrete, waterproofing, mechanical, electrical, finishing and surrounding works are included
Has Filtration Been Calculated?
Filter and pump are not just a catalogue pick; they must be sized to pool volume, pipe runs and intensity of use
Are Equipment Brand/Model Given?
"Pump and automation included" is not enough on its own — brand, model, capacity and warranty terms must appear in the quote
Are There Real Project References?
Not just renders — you should be able to see completed projects with known size, system, year and location.
Frequently Asked Questions
Elazığ pool construction; clear answers.
Çilek Havuz — Elazığ
Pool & Wellness Engineering
- Response Time
- Same day
- Channels
- Phone · E-mail · WhatsApp
If the answer you are looking for is not here, send your question directly to us and our team will reply as soon as possible.
Book a free site surveyA standard villa pool is delivered turnkey in about 20–35 working days, from excavation to filling. The sequence runs through survey and design, excavation and structural concrete, curing and waterproofing, finishing and mechanical installation, then commissioning; the exact schedule depends on size, weather, ground conditions and the chosen finish.
Çilek Havuz — Elazığ
There is no single price per square metre that fits every project in Elazığ — ground conditions and system choice can put two identically sized gardens in completely different budgets. The real cost drivers are: the pool's net dimensions and depth, the system, excavation and site access, ground and drainage requirements, filter–pump–automation capacity, waterproofing, heating or an automatic cover, and the surrounding landscaping. A photo of the garden and basic measurements are enough for a rough estimate; a firm quote follows only after an on-site survey.
Çilek Havuz — Elazığ
In Elazığ Municipality and the district municipalities, a pool is processed as an addition to the building permit with structural and mechanical plans; in this seismic zone, a soil survey and structural calculation are mandatory. For plots along Lake Hazar, coastal edge line and protection zone regulations are verified before the project starts.
Çilek Havuz — Elazığ
Elazığ's continental climate shapes the pool on three points: January averages below zero, with nights down to -20 °C, so freeze-thaw resistance (air-entrained concrete, frost-rated finish, a winterizing protocol) is mandatory for outdoor pools; July highs above 30 °C combined with relative humidity below 40 percent roughly double evaporation compared with the Black Sea coast, which is why a cover and automatic water top-up are built into the design; annual rainfall of around 420 mm simplifies drainage. The ground consists of the Elazığ basin's alluvial and limestone layers; because of the East Anatolian Fault Zone that produced the 2020 Sivrice earthquake, the shell and plant room are calculated to a high seismic load class.
Çilek Havuz — Elazığ
Frost-Resistant Reinforced-Concrete Villa Pool: An outdoor pool system for detached homes in central Elazığ, planned with air-entrained concrete, a frost-rated finish and a winterizing protocol. Heated Indoor Pool answers a different need — For homes and hotels wanting year-round use through the long winter, an indoor pool is built with a dehumidification unit, heat pump and sub-floor insulation. The right choice is made together during the site survey, based on the slope, the view and the delivery time you are aiming for.
Çilek Havuz — Elazığ
Air-entrained C30/37 concrete, frost-rated ceramic or mosaic finish, and a winterizing protocol with water-level lowering and pipe draining; the heat pump and cover are sized together for year-round use.
Çilek Havuz — Elazığ
No; the water is not drained. The level is lowered below the skimmer, pipes are blown out with compressed air and plugged, winter chemicals are added and a cover is fitted. A reinforced-concrete pool left empty gets pushed and cracked by groundwater and frost from below; a full, covered pool gets through winter safely.
Çilek Havuz — Elazığ

