Skip to content
Çilek Havuz
Samsun Regional Pool Construction

Samsun Swimming Pool Construction & Black Sea Villa Pools

In Samsun, the largest city on the Black Sea coast, we build reinforced concrete outdoor and indoor pools for detached homes along the Atakum shoreline, in Canik and Ilkadim, and on the Bafra and Carsamba plains, engineered for high groundwater and more than 700 mm of annual rainfall.

Scroll

Çilek Havuz in Numbers

We build dependable pools across the Samsun region with 2026 years of engineering experience.

33+
Years
14
Export
350+
Projects

Samsun Swimming Pool Construction & Black Sea Villa Pools — Frames from Our Projects

Frames from Our Projects

06 media

Quick Contact

Let Us Call You

Leave four details and your account manager will call you about projects in the Samsun region — or reach us directly on the lines below.

Call Directly+90 216 475 39 37WhatsAppMessage Us
Duygu TuncarSales & Client Relations
Frequently Asked

Before You Decide

Yes. A geotechnical survey measures the water table, the excavation is dewatered, and the floor receives a hydrostatic relief valve with perimeter drainage, so groundwater cannot push the shell upward when the pool is emptied for maintenance.

There is no single price per square metre for every project in the Samsun region — ground and system choice can put two identically sized gardens in completely different budgets. A photo of the garden and basic measurements are enough for a rough estimate; a firm quote is prepared only after an on-site survey.

In Samsun's metropolitan and district municipalities a pool is filed with the building permit together with structural and MEP drawings; a geotechnical report is required on the delta plains. On agricultural land in Bafra and Carsamba the zoning status is verified in advance.

Samsun's humid, rainy climate and the alluvial soils of the Kizilirmak and Yesilirmak deltas set two engineering priorities: dewatering during excavation, and a hydrostatic relief valve with perimeter drainage so the shell cannot lift when the pool is emptied. On the coast, 316-grade stainless fittings resist salt air, and indoor pools are specified with a dehumidification unit from the outset.

Project Videos

Our Projects in Motion

Türkiye's Deepest Training Pool · Mechanical System

Türkiye's Deepest Training Pool · Mechanical System

November 2025 · 0:44

Türkiye's Deepest Training Pool · 10 Metres

Türkiye's Deepest Training Pool · 10 Metres

August 2025 · 2:28

Sapanca Çetin Bey

Sapanca Çetin Bey

Sapanca · April 2022 · 0:52

Şile Cihan Bey

Şile Cihan Bey

İstanbul · July 2021 · 0:38

Pool Type Comparison

Every project tells its own story; together we choose the right pool.

Installation
6–8 Weeks
Lifespan
20+ Years
Warranty
2 Years
Durability
Customization
Features8/8
  • Custom Shape
  • Variable Depth
  • Infinity Edge
  • Indoor
  • Heating System
  • Automation
  • Waterfall
  • LED Lighting
Installation
2–3 Weeks
Lifespan
5–10 Years
Warranty
2 Years
Durability
Customization
Features6/8
  • Custom Shape
  • Variable Depth
  • Infinity Edge
  • Indoor
  • Heating System
  • Automation
  • Waterfall
  • LED Lighting
Installation
1 Week
Lifespan
5–10 Years
Warranty
2 Years
Durability
Customization
Features6/8
  • Custom Shape
  • Variable Depth
  • Infinity Edge
  • Indoor
  • Heating System
  • Automation
  • Waterfall
  • LED Lighting
Samsun Climate and Ground Conditions

Samsun's humid, rainy climate and the alluvial soils of the Kizilirmak and Yesilirmak deltas set two engineering priorities: dewatering during excavation, and a hydrostatic relief valve with perimeter drainage so the shell cannot lift when the pool is emptied. On the coast, 316-grade stainless fittings resist salt air, and indoor pools are specified with a dehumidification unit from the outset.

See the waterproofing detail
Permit & Zoning Consultancy

In Samsun's metropolitan and district municipalities a pool is filed with the building permit together with structural and MEP drawings; a geotechnical report is required on the delta plains. On agricultural land in Bafra and Carsamba the zoning status is verified in advance.

See the permit process

Company & Contact

To talk about your project, we are one call away.

Legal Name

Çilek Havuz

Founded

1998 · Istanbul

Head Office

Çilek Plaza, Eyüp Sultan Mah. Yakacık Cd. Feshane Cd. No: 2 D:4 D:1, 34885 Sancaktepe / İstanbul

Service Area

All of Türkiye · exports to 14 countries

Samsun Most Preferred Pool Solutions in the Region

Groundwater-Safe Concrete Villa PoolHumidity-Controlled Indoor PoolAtakum Seafront Overflow PoolResidential Complex & Hotel Pool

Process

How Does the Turnkey Process Work?

A standard villa pool passes through these five stages, from excavation to filling, and is delivered turnkey in about 20–35 working days. The exact schedule depends on size, weather, ground conditions and the chosen finish.

01

Survey & Design

02

Excavation & Structural Concrete

03

Curing & Waterproofing

04

Finishing & Mechanical Installation

05

Commissioning

Read the full process step by step
Budget

What Determines the Price?

There is no single price per square metre that fits every project in the Samsun region; ground and system choice can put two identically sized gardens in completely different budgets. A photo of the garden and basic measurements are enough for a rough estimate — a firm quote follows the site survey.

See the cost items in detailBrowse the full pool equipment catalogue
Decision Guide

What Should You Check When Choosing a Pool Company?

Two quotes are usually compared side by side, yet their scopes are rarely the same. We suggest asking these four questions before you look at the total:

01

Is the Scope Clearly Stated?

It must state clearly which of excavation, concrete, waterproofing, mechanical, electrical, finishing and surrounding works are included

02

Has Filtration Been Calculated?

Filter and pump are not just a catalogue pick; they must be sized to pool volume, pipe runs and intensity of use

03

Are Equipment Brand/Model Given?

"Pump and automation included" is not enough on its own — brand, model, capacity and warranty terms must appear in the quote

04

Are There Real Project References?

Not just renders — you should be able to see completed projects with known size, system, year and location.

Frequently Asked Questions

Samsun pool construction; clear answers.

ÇH

Çilek Havuz — Samsun

Pool & Wellness Engineering

Response Time
Same day
Channels
Phone · E-mail · WhatsApp

If the answer you are looking for is not here, send your question directly to us and our team will reply as soon as possible.

Book a free site survey

A standard villa pool is delivered turnkey in about 20–35 working days, from excavation to filling. The sequence runs through survey and design, excavation and structural concrete, curing and waterproofing, finishing and mechanical installation, then commissioning; the exact schedule depends on size, weather, ground conditions and the chosen finish.

Çilek Havuz — Samsun

There is no single price per square metre that fits every project in Samsun — ground conditions and system choice can put two identically sized gardens in completely different budgets. The real cost drivers are: the pool's net dimensions and depth, the system, excavation and site access, ground and drainage requirements, filter–pump–automation capacity, waterproofing, heating or an automatic cover, and the surrounding landscaping. A photo of the garden and basic measurements are enough for a rough estimate; a firm quote follows only after an on-site survey.

Çilek Havuz — Samsun

In Samsun's metropolitan and district municipalities a pool is filed with the building permit together with structural and MEP drawings; a geotechnical report is required on the delta plains. On agricultural land in Bafra and Carsamba the zoning status is verified in advance.

Çilek Havuz — Samsun

Samsun's humid, rainy climate and the alluvial soils of the Kizilirmak and Yesilirmak deltas set two engineering priorities: dewatering during excavation, and a hydrostatic relief valve with perimeter drainage so the shell cannot lift when the pool is emptied. On the coast, 316-grade stainless fittings resist salt air, and indoor pools are specified with a dehumidification unit from the outset.

Çilek Havuz — Samsun

Reinforced Concrete Villa Pool: The most common system for detached homes in Atakum and Canik; planned with dewatering, an uplift relief valve and dual-layer waterproofing. Humidity-Controlled Indoor Pool answers a different need — In Samsun, where most of the year is humid, the indoor pool volume is protected from condensation with a dehumidification unit and vapour-barrier details. The right choice is made together during the site survey, based on the slope, the view and the delivery time you are aiming for.

Çilek Havuz — Samsun

Wellpoint dewatering during excavation on delta soils, a hydrostatic relief valve under the floor and perimeter drainage keep an emptied pool from floating.

Çilek Havuz — Samsun

Yes. A geotechnical survey measures the water table, the excavation is dewatered, and the floor receives a hydrostatic relief valve with perimeter drainage, so groundwater cannot push the shell upward when the pool is emptied for maintenance.

Çilek Havuz — Samsun